Causes of elective surgery cancellation and theatre throughput efficiency in an Australian urology unit

نویسندگان

  • Andrew Keller
  • Akbar Ashrafi
  • Ahmad Ali
  • M Hammad Ather
  • Levent Turkeri
چکیده

OBJECTIVE To evaluate our unit's theatre throughput efficiency, to identify where inefficiencies existed and consequently where the greatest improvement might be made.To identify the causes of day of surgery cancellations and how they might be avoided.  PATIENTS AND METHODS A prospective audit of theatre utilisation was undertaken over a 6 month period between 05/02//2013 and 02/08/2013 at Ipswich General Hospital, QLD, Australia.TIMES COLLECTED WERE: time of patient arrival in anaesthetic bay, start time of operative procedure, end time of operative procedure, and time of patient leaving theatre.The causative factors for any delays or day of surgery cancellations were identified and recorded where possible.  RESULTS In the six month period 26,850 sessional minutes were available for elective operating over 100 operating sessions.304 elective cases were performed, split between 21 major and 283 minor proceduresThe sessions ran overtime a cumulative 2114 minutes.Total non-operative minutes totalled 13,209 (50.3% of all available time), split between late starts 499 minutes (1.8%), early list finishes 1894 minutes (7.05%),  changeover time 1869 minutes (6.9%) and anaesthetic time, 8974 minutes (33.4%)Actual operating time only compromised 50.7% of all available elective operating session time (13,614 minutes)Theatre utilisation was 91.8%.51 procedures were cancelled on the day of surgery during the audit period, representing 14.3% of all scheduled procedures.The most common reason for cancellation was lack of surgical fitness, followed by inadequate operative time.  CONCLUSION  A significant proportion of all elective operative time was consumed by non-operative minutes.Inefficiencies existed in turnover of patients as well as over as well as underbooking of patients on elective lists.An excessive number of cases were cancelled on the day of surgery, wasting valuable operative time.A multi-parametric approach must be taken to improve operation list utilisation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

بررسی میزان و علل لغو اعمال جراحی : شناسائی حوزه های قابل بهبود 

Background: Operating room efficiency is a major determinant of hospital cost. Maximizing throughput, while maintaining quality, is therefore paramount to maintenance of financial viability. Cancellation of surgery may increase a hospital's cost and affect the efficiency of operating room and waste of resources. This study was conducted to determine the rate and causes of canceled surgeries, an...

متن کامل

کاهش لغو اعمال جراحی در یک بیمارستان: گزارش کوتاه

Background: Operation theatre in a hospital requires considerable human and physical resources to deliver surgery services on an agreed schedule. However, operation theatres are sometimes underutilized due to avoidable last minute cancellations of operations. Cancellation of operations on the day of intended surgery results in operation theatre planning difficulties, hospital inefficiency and r...

متن کامل

Cancellation of operations on the day of intended surgery at a major Australian referral hospital.

OBJECTIVE To establish the rate of and reasons for cancellations of surgery on the scheduled day in an Australian hospital. DESIGN Prospective survey. SETTING Major metropolitan tertiary hospital, 13 May to 15 November 2002. MAIN OUTCOME MEASURES Proportion of operations cancelled on the day of surgery, obtained each day from the operating theatre list and a separate list of additions and...

متن کامل

Causes of cancellations on the day of surgery at a Tertiary Teaching Hospital

BACKGROUND Cancellation of elective scheduled operations on the day of surgery leads to an inefficient use of operating room (OR) time and a waste of resources. It also causes inconvenience for patients and families. Moreover, day of surgery (DOS) cancellation creates logistic and financial burden associated with extended hospital stay and repetitions of pre-operative preparations as well as op...

متن کامل

Managing access block.

There is pessimism regarding the ability of the Acute Health Sector to manage access block for emergency and elective patients. Melbourne Health suffered an acute bed crisis in 2001 resulting in record ambulance diversions and emergency department (ED) delays. We conducted an observational study to reduce access block for emergency patients whilst maintaining elective throughput at Melbourne He...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره 3  شماره 

صفحات  -

تاریخ انتشار 2014