Input control in a batch production system with lead times, due dates and random yields

نویسندگان

  • Yunzeng Wang
  • Yigal Gerchak
چکیده

The presence of random yields in many manufacturing processes can considerably complicate production planning and control. We investigate a batch production system with due dates, where the yield of each batch is random and the production lead time is longer than the time interval between starting consecutive batches. To satisfy an order with a given due date, several input batches could be initiated. But the realized yields of batches still in process are unknown when the next batch size needs to be determined. We formulate this general problem as a dynamic program with the objective of minimizing the total expected discounted costs. For a simple version of the model with linear cost parameters and one work-in-process batch, we show that the structure of the optimal input control policy is of a single critical level type for the work-in-process batch size. We prove that, for given outstanding demand, this critical level becomes larger as the number of input opportunities becomes smaller. Furthermore, if the discount factor equals to 1, this critical level is shown to be strictly greater than the outstanding demand. Production often starts earlier than necessary in order to utilize yield realizations of initial batches for judicious choice of later batches, and to achieve diversi®cation over time. Ó 2000 Elsevier Science B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Due Date Assignment and Lot Sizing with Uncertain Flow Times

Due date assignment for customer orders has been studied in various productionenvironments using different modeling approaches. In this paper the researchers consider aproduction system in which the orders of several customers are produced in a single batch because ofthe economy of scale. If a batch is completed before receiving customer orders, inventory carryingcost is incurred but if it is c...

متن کامل

Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm

Flexible manufacturing system (FMS) readily addresses the dynamic needs of the customers in terms of variety and quality. At present, there is a need to produce a wide range of quality products in limited time span. On-time delivery of customers’ orders is critical in make-to-order (MTO) manufacturing systems. The completion time of the orders depends on several factors including arrival rate, ...

متن کامل

Optimal Batch Production for a Single Machine System with Accumulated Defectives and Random Rate of Rework

In this paper we consider an imperfect production system which produces good and defective items and assume that defective items can be reworked. Due to the nature of rework process we do not restrict the rework rate to be equal to normal production rate or constant and assume that it is a random variable with an arbitrary distribution function. We also assume as it is true in most real world s...

متن کامل

An integrated vendor–buyer model with stochastic demand, lot-size dependent lead-time and learning in production

In this article, an imperfect vendor–buyer inventory system with stochastic demand, process quality control and learning in production is investigated. It is assumed that there are learning in production and investment for process quality improvement at the vendor’s end, and lot-size dependent lead-time at the buyer’s end. The lead-time for the first batch and those for the rest of the batches ...

متن کامل

A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates

This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 126  شماره 

صفحات  -

تاریخ انتشار 2000