Buffered Resource Constraint: Algorithms and Complexity
نویسندگان
چکیده
The notion of buffered resource is useful in many problems. A buffer contains a finite set of items required by some activities, and changing the content of the buffer is costly. For instance, in instruction scheduling, the registers are a buffered resource and any switch of registers has a significant impact on the total runtime of the compiled code. We first show that sequencing activities to minimize the number of switches in the buffer is NP-hard. We then introduce an algorithm which, given a set of already sequenced activities, computes a buffer assignment which minimizes the number of switches in linear time, i.e., O(nd) where n is the length of the sequence and d the number of buffered items. Next, we introduce an algorithm to achieve bound consistency on the constraint Switch, that bounds the number of changes in the buffer, in O(nd+ nd) time. Finally, we report the results of experimental evaluations that demonstrate the efficiency of this propagator.
منابع مشابه
Multi-layer Clustering Topology Design in Densely Deployed Wireless Sensor Network using Evolutionary Algorithms
Due to the resource constraint and dynamic parameters, reducing energy consumption became the most important issues of wireless sensor networks topology design. All proposed hierarchy methods cluster a WSN in different cluster layers in one step of evolutionary algorithm usage with complicated parameters which may lead to reducing efficiency and performance. In fact, in WSNs topology, increasin...
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملResource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملImproving Success Ratio in Multi-Constraint Quality of Service Routing
Multi-constraint quality-of-service routing will become increasingly important as the Internet evolves to support real-time services. It is well known however, that optimum multi-constraint QoS routing is computationally complex, and for this reason various heuristics have been proposed for routing in practical situations. Among these methods, those that use a single mixed metric are the mo...
متن کامل