Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies

نویسندگان

  • Osman Taylan
  • Abdallah O. Bafail
  • Reda M. S. Abdulaal
  • Mohammed R. Kabli
چکیده

Construction projects are initiated in dynamic environment which result in circumstances of high uncertainty and risks due to accumulation of many interrelated parameters. The purpose of this study is to use novel analytic tools to evaluate the construction projects and their overall risks under incomplete and uncertain situations. It was also aimed to place the risk in a proper category and predict the level of it in advance to develop strategies and counteract the high-risk factors. The study covers identifying the key risk criteria of construction projects at King Abdulaziz University (KAU), and assessing the criteria by the integrated hybrid methodologies. The proposed hybrid methodologies were initiated with a survey for data collection. The relative importance index (RII) method was applied to prioritize the project risks based on the data obtained. The construction projects were then categorized by fuzzy AHP and fuzzy TOPSIS methodologies. Fuzzy AHP (FAHP) was used to create favorable weights for fuzzy linguistic variable of construction projects overall risk. The fuzzy TOPSIS method is very suitable for solving group decision making problems under the fuzzy environment. It attempted to incorporate vital qualitative attributes in performance analysis of construction projects and transformed the qualitative data into equivalent quantitative measures. Thirty construction projects were studied with respect to five main criteria that are the time, cost, quality, safety and environment sustainability. The results showed that these novel methodologies are able to assess the overall risks of construction projects, select the project that has the lowest risk with the contribution of relative importance index. This approach will have potential applications in the future. Crown Copyright © 2014 Published by Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Project Selection by Using Fuzzy AHP and TOPSIS Technique

In this article, by using fuzzy AHP and TOPSIS technique we propose a new method for project selection problem. After reviewing four common methods of comparing alternatives investment (net present value, rate of return, benefit cost analysis and payback period) we use them as criteria in AHP tree. In this methodology by utilizing improved Analytical Hierarchy Process by Fuzzy set theory, first...

متن کامل

Safety risk assessment and ranking in the construction projects with F.M.E.A and fuzzy T.O.P.S.I.S

Abstract Introduction: Construction projects are one of the most important sectors of the economy of the country, which has a high capacity for job creation. Construction projects are part of a huge and strategic set of civil engineering projects that unfortunately have a large share of work-related accidents due to lack of attention to safety. One of the most important issues that can contrib...

متن کامل

Power plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method

Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...

متن کامل

Land Evaluation Techniques Comparing Fuzzy AHP with TOPSIS methods

Increases in populations and in particular in developing countries are placing increased pressure on both natural and agricultural resources. In many cases, especially in semi-arid regions, the pressures are compounded by restricted agricultural lands. Reliable and relevant land evaluation is a requirement for land use policy and decision making to support sustainable rural development. Land ev...

متن کامل

Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects

Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Appl. Soft Comput.

دوره 17  شماره 

صفحات  -

تاریخ انتشار 2014