!"#$%&' ( )%&*+,& $-. ,*$/$0/& *12)1-&-3"0$,&. ,+24/$3+1-311/ 51% &20&..&. 24/3+)%1*&,1% +-.4,3%+$/ $))/+*$3+1-, 67 8-3%1.4*3+1
نویسندگان
چکیده
We present a component-based framework and its supporting simulation tool for joint software-hardware modelling and performance analysis of multiprocessor embedded systems. This joint evaluation enables predicting the impact of hardware configuration on software performance and hardware capability to accommodate other services at design time. The experiments carried out on several reallife industrial-size applications show that our framework is scalable while achieving fast simulation speeds, and delivers correct performance trends which are successfully used for identifying and improving limiting performance factors.
منابع مشابه
antibody test
CD4+ 39-7 (6-8) 36-0 (6-4) 25-9 (11-4) 34-5 (4-4) CD8+ 26-9 (11-3) 47-9 (9-7)' 24-6 (4 0) 54-0 (4 2)* CD4+/CD8+ 1-68 (0-71) 0-79 (0-26) 1-09 (0-45) 0-65 (0-12) CD4+ HLA-DR+ 3-0 (0-8) 24-8 (8-3)' 2-7 (2-9) 20-2 (7-9)': CD8+ HLA-DR+ 4-4 (2-6) 37-9 (7-7)' 3-6 (1-7) 35-2 (11-2)r CD4+ HLA-DR+/CD8+ HLA-DR+ 0-91 (0-52) 0-68 (0-27) 0-71 (0 46) 0-57 (0-11) CD4+CD29+ 22-4 (4-3) 32-3 (6-8) 16-1 (10-2) 33-...
متن کاملIntroduction to Methodology and Encoding Rules
1 1 0 0 0 1 2 1 0 0 0 1 3 1 1 0 0 2 4 1 1 1 1 4 5 1 4 1 4 10 6 1 3 4 16 24 7 1 12 4 50 67 8 1 10 13 158 182 9 1 34 13 472 520 10 1 28 39 1406 1474 11 1 97 39 4111 4 248 12 1 81 116 11 998 12 196 13 1 27 1 115 34781 35 168 14 1 226 339 100 660 101 226 15 1 764 336 290 464 291 565 16 1 638 988 837 137 838 764 17 1 2141 977 2 408 914 2 412 033 18 1 1787 2866 6 925 100 6 929 754 19 1 6025 2832 1988...
متن کاملLine 803 (12/11/16) -- Metro Rail - Metro Green Line - RailEastbound to Norwalk - Westbound to Redondo Beach
— — — — — — — — — — 3:36A 3:42A 3:58A 4:08A — 3:53A 3:55A 3:57A 3:59A 4:02A 4:05A 4:07A 4:09A 4:11A 4:13 4:16 4:21 4:25 — 4:21 4:23 4:25 4:27 4:30 4:33 4:35 4:37 4:39 4:41 4:44 4:49 4:53 4:31A 4:33 4:35 4:37 4:39 4:42 4:45 4:47 4:49 4:51 5:00 5:03 5:08 5:12 4:50 4:52 4:54 4:56 4:58 5:01 5:04 5:06 5:08 5:10 5:12 5:15 5:20 5:24 5:03 5:05 5:07 5:09 5:11 5:14 5:17 5:19 5:21 5:23 5:25 5:28 5:33 5:37...
متن کاملExample G Cost of construction of nuclear power plants
Table G.1 gives data, reproduced by permission of the Rand Corporation, from a report (Mooz, 1978) on 32 light water reactor (LWR) power plants constructed in USA. It is required to predict the capital cost involved in the construction of further LWR power plants. The notation used in Table G.1 is explained in Table G.2. The final 6 lines of data in Table G.1 relate to power plants for which th...
متن کاملLine 804 (06/26/16) -- Metro Rail - Metro Gold Line (Azusa – Union Station – East LA)
4:20A 4:30A 4:34A 4:40A 4:44A 4:50A 4:56A 4:59A 5:04A 5:05A 5:09A 5:12A 5:17A 5:20A 5:24A 5:28A 5:32A 4:44 4:54 4:58 5:04 5:08 5:14 5:20 5:23 5:28 5:29 5:33 5:36 5:41 5:44 5:48 5:52 5:56 5:04 5:14 5:18 5:24 5:28 5:34 5:40 5:43 5:48 5:49 5:53 5:56 6:01 6:04 6:08 6:12 6:16 5:24 5:34 5:38 5:44 5:48 5:54 6:00 6:03 6:08 6:09 6:13 6:16 6:21 6:24 6:28 6:32 6:36 5:44 5:54 5:58 6:04 6:08 6:14 6:20 6:23 ...
متن کامل