Competence-driven project portfolio selection, scheduling and staff assignment
نویسندگان
چکیده
This paper presents a new model for project portfolio selection, paying specific attention to competence development. The model seeks to maximize a weighted average of economic gains from projects and strategic gains from the increment of desirable competencies. As a sub-problem, scheduling and staff assignment for a candidate set of selected projects must also be optimized. We provide a nonlinear mixed-integer program formulation for the overall problem, and then propose heuristic solution techniques composed of (i) a greedy heuristic for the scheduling and staff assignment part, and (ii) two (alternative) metaheuristics for the project selection part. The paper outlines experimental results on a real-world application provided by the E-Commerce Competence Center Austria and, for a slightly simplified instance, presents comparisons with the exact solution computed by CPLEX.
منابع مشابه
Project Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملThe project portfolio selection and scheduling problem: mathematical model and algorithms
This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملMulti-criteria approach to project portfolio selection considering structural hardness and correlations between projects
Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...
متن کاملIT Project Portfolio Scheduling and Multi-skilled Staff Assignment with Ant Colony Optimization Algorithm
Human resource is a key factor for IT new product development. Considering multi-skilled employees in IT Project Portfolio Scheduling, a mixed integer nonlinear programming model with three optimization objectives is proposed from the view of project or product managers. The three objectives are to maximize the increments of skill efficiency values for all multi-skilled employees, to minimize R...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- CEJOR
دوره 16 شماره
صفحات -
تاریخ انتشار 2008