Green public procurement and multiple environmental objectives

نویسندگان

  • Sofia Lundberg
  • Per-Olov Marklund
چکیده

Policy makers can employ different instruments to address environmental policy objectives, and the guiding principles for a consistent system of environmental policy are (1) the policies should be effective, (2) there should be one objective per instrument, and (3) multiple objectives and multiple policy instruments must be mutually independent of each other. This paper evaluates these three principles for green public procurement (GPP). As an illustrative example, the analysis refers to the Swedish policy of using public purchase of organic foods as a policy instrument to increase the certified organic agricultural area as a share of the total agricultural area. Our analysis shows that GPP fails to satisfy principles (1) and (3), and the only way to satisfy principle (2) is then to have just one objective with the procurement, i.e., to run the operations. GPP might still have a positive environmental impact, but, if applied, the procuring authority has to be very specific with the one-to-one matching of criterion and objective.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

LEED Adopters : Public Procurement and the Private Supply of “ Green ” Buildings

October 18, 2011 DRAFT: DO NOT CITE OR CIRCULATE Governments often use their considerable purchasing power to promote policy objectives. However, it remains unclear whether or when public procurement preferences can stimulate private markets for innovative products and services. We examine municipal government procurement policies that mandate the construction of “green” buildings. We ask wheth...

متن کامل

Greening Public Procurement: a review of the issues

Purchasing in the public sector differs in important ways from private sector procurement. Understanding how these differences affect the ‘greening’ of supply practice is important not just for the public sector itself, but also fir any attempt to develop explanations of how organisations in general make a link between what and how they buy and the impact of such purchasing on the environment. ...

متن کامل

Environmental Criteria in the Spanish Public Works Procurement Process

Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental...

متن کامل

Capacitated Multimodal Structure of a Green Supply Chain Network Considering Multiple Objectives

In this paper, a supply chain network design problem is explained which contains environmental concerns in arcs and nodes of network. It is assumed that there are some routes such as road, rail and etc. in each pair of nodes. In this model decision variables are choosing facilities to open, environmental investment level in each facility and flow of products between nodes in each route. A multi...

متن کامل

Green Public Procurement in academic literature: a survey

The first author’s master thesis (published elsewhere) is a comprehensive literature review of 16 years of academic research on Public Procurement. Here we focus on the literature on Green Public Procurement. The original literature review concerns papers published in English in academic journals covered by Scopus and Web of Science in the 1997-2012 timeframe. Through a rigorous review process ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2018