Facility-wide Planning and Scheduling of Printed a Grasp for Single Machine Scheduling with Sequence Dependent Setup Costs and Linear Delay Penalties, Tech. Report, Operations Procedure Grasp()
نویسنده
چکیده
A greedy randomized adaptive search procedure for the quadratic assignment problem, A new method for solving hard Sat-A greedy randomized adaptive search procedure for the 2-partition problem,
منابع مشابه
Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملEfficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine
Just-in-time scheduling problem on a single batch processing machine is investigated in this research. Batch processing machines can process more than one job simultaneously and are widely used in semi-conductor industries. Due to the requirements of just-in-time strategy, minimization of total earliness and tardiness penalties is considered as the criterion. It is an acceptable criterion for b...
متن کاملA novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...
متن کاملAn Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes
This paper considers the problem of minimizing make-span and maximum tardiness simultaneously for scheduling jobs under non-identical job sizes, dynamic job arrivals, incompatible job families,and sequence-dependentfamily setup time on the single batch- processor, where split size of jobs is allowed between batches. At first, a new Mixed Integer Linear Programming (MILP) model is proposed for t...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کامل