Commissioning Status of the Decelerator Test Beam Line in Ctf3

نویسندگان

  • E. Adli
  • S. Döbert
چکیده

The CLIC Test Facility (CTF3) at CERN was constructed by the CTF3 collaboration to study the feasibility of the concepts for a compact linear collider. The test beam line (TBL) recently added to the CTF3 machine was designed to study the CLIC decelerator beam dynamics and 12 GHz power production. The beam line consists of a FODO lattice with high precision BPM’s and quadrupoles on movers for precise beam alignment. A total of 16 Power Extraction and Transfer Structures (PETS) will be installed in between the quadrupoles to extract 12 GHz power from the drive beam provided by the CTF3 machine. The CTF3 drive beam with a bunchtrain length of 140 ns, 12 GHz bunch repetition frequency and an average current over the train of up to 28 A will be injected into the test beam line. Each PETS structure will produce 135 MW of 12 GHz power at nominal current. The beam will have lost more than 50 % of its initial energy of 150 MeV at the end of the beam line and will contain particles with energies between 65 MeV and 150 MeV. The beam line is completely installed and the PETS structures will be successively added until the end of 2011. The paper will describe the first results obtained during commissioning of the beam line and the first PETS prototype.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

First Experimental Results with the Clic Drive Beam Phase Feedforward Prototype at the Clic Test Facility Ctf3∗

The two-beam acceleration scheme envisaged for CLIC will require a high degree of phase stability between two beams at the drive beam decelerator sections, to allow efficient acceleration of the main beam. There will be up to 48 such decelerator sections for the full 3 TeV design, and each decelerator section will be instrumented with a feed-forward system to correct the drive beam phase to a p...

متن کامل

European Organization for Nuclear Research Cern – Accelerators and Technology Sector

The aim of the latest CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. Several of the main goals have been already achieved in the past years, like the full-loading linac operation mode and the delay loop principle. During 2008 also the combiner ring concept has been experimentally pro...

متن کامل

An Overview of the New Clic Test Facility (ctf3)

The CLIC (Compact Linear Collider) RF power source is based on a new scheme of electron pulse compression and bunch frequency multiplication, in which the drive beam time structure is obtained by the combination of electron bunch trains in isochronous rings. The next CLIC Test Facility (CTF3) at CERN will be built in order to demonstrate the technical feasibility of the scheme. It will also con...

متن کامل

Beam Halo Studies for Ctf3

Beam halo can have severe effects on the performance of high energy accelerators. It reduces the experimental throughput, may lead to noise in the experiments, or even damage accelerator components. In order to understand and ideally control the formation and evolution of beam halo, detailed studies are required. In this contribution halo generation mechanisms and the underlying physical princi...

متن کامل

Beam Dynamics for the Preliminary Phase of the New Clic Test Facility (ctf3)

In the framework of the CLIC (Compact Linear Collider) RF power source studies, the scheme of electron pulse compression and bunch frequency multiplication, using injection by RF deflectors into an isochronous ring, will be tested, at low charge, during the preliminary phase of the new CLIC Test Facility (CTF3) at CERN. In this paper, we describe the beam dynamics studies made in order to asses...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011