Optimizing the open pit-to-underground mining transition
نویسندگان
چکیده
A large number of metal deposits are initially extracted via surface methods, but then transition underground without necessarily ceasing to operate above ground. Currently, most mine operators schedule the open pit and underground operations independently and then merge the two, creating a myopic solution. We present a methodology to maximize the NPV for an entire metal deposit by determining the spatial expanse and production quantities of both the open pit and underground mines while adhering to operational production and processing constraints. By taking advantage of a new linear programming solution algorithm and using an ad-hoc branch-and-bound scheme, we solve real-world scenarios of our transition model to near optimality in a few hours, where such scenarios were otherwise completely intractable. The decision of where and when to transition changes the net present value of the mine by hundreds of millions of dollars.
منابع مشابه
An Uncertainty-based Transition from Open Pit to Underground Mining
There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...
متن کاملPhysical Model Test and Numerical Simulation Study of Deformation Mechanism of Wall Rock on Open Pit to Underground Mining (RESEARCH NOTE)
This paper is based on the open pit to underground mining practice of Daye Iron Mine. The influence mechanism between high-steep slope and non-pillar sublevel caving method is studied by using physical model test. Firstly, engineering geological properties of the choosing typical research section is analysed and generalized. Secondly, the system of open pit to underground mining is developing a...
متن کاملInvestigation of Bishop’s and Janbu’s Models Capabilities on Slope Stability Problems with Special Consideration to Open-Pit Mining Operations
One of the most effective parameters in economics of open-pit mines is the pit slope angle, so that the slope angle more than the optimum value increases the probability of a large failure in the pit wall and the slope angle less than the optimum value leads to increasing stripping ratio and reducing net present value of mine. Therefore, in this paper, considering the limit equilibrium methods ...
متن کاملApplication of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines
Estimating the costs of blasting operations is an important parameter in open-pit mining. Blasting and rock fragmentation depend on two groups of variables. The first group consists of mass properties, which are uncontrollable, and the second one is the drill-and-blast design parameters, which can be controlled and optimized. The design parameters include burden, spacing, hole length, hole diam...
متن کاملOpen pit limit optimization using dijkstra’s algorithm
In open-pit mine planning, the design of the most profitable ultimate pit limit is a prerequisite to developing a feasible mining sequence. Currently, the design of an ultimate pit is achieved through a computer program in most mining companies. The extraction of minerals in open mining methods needs a lot of capital investment, which may take several decades. Before the extraction, the p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- European Journal of Operational Research
دوره 257 شماره
صفحات -
تاریخ انتشار 2017