Decomposition heuristics for minimizing earliness-tardiness on parallel burn-in ovens with a common due date
نویسندگان
چکیده
This paper considers a scheduling problem for parallel burn-in ovens in the semiconductor manufacturing industry. An oven is a batch processing machine with restricted capacity. The batch processing time is set by the longest processing time among those of all the jobs contained in the batch. All jobs are assumed to have the same due date. The objective is to minimize the sum of the absolute deviations of completion times from the due date (earliness–tardiness) of all jobs. We suggest three decomposition heuristics. The first heuristic applies the exact algorithm due to Emmons and Hall (for the nonbatching problem) in order to assign the jobs to separate early and tardy job sets for each of the parallel burn-in ovens. Then, we use job sequencing rules and dynamic programming in order to form batches for the early and tardy job sets and sequence them optimally. The second proposed heuristic is based on genetic algorithms. We use a genetic algorithm in order to assign jobs to each single burn-in oven. Then, after forming early and tardy job sets for each oven we apply again sequencing rules and dynamic programming techniques to the early and tardy jobs sets on each single machine in order to form batches. The third heuristic assigns jobs to the m early job sets and m tardy jobs sets in case of m burn-in ovens in parallel via a genetic algorithm and applies again dynamic programming and sequencing rules. We report on computational experiments based on generated test data and compare the results of the heuristics with known exact solution for small size test instances obtained from a branch and bound scheme. 2006 Elsevier Ltd. All rights reserved.
منابع مشابه
Minimizing earliness–tardiness on a single burn-in oven with a common due date and maximum allowable tardiness constraint
This paper considers a scheduling problem for a single burn-in oven in the semiconductor manufacturing industry where the oven is a batch processing machine with restricted capacity. The batch processing time is set by the longest processing time among those of all the jobs contained in the batch. All jobs are assumed to have the same due date. The objective is to minimize the sum of the absolu...
متن کاملA comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملAn efficient meta-heuristic for the single machine common due date scheduling problem
A new meta-heuristic for scheduling multiple jobs on a single machine so that they are completed by a common specified date (neither earlier, nor later) is addressed in this paper. Costs are set depending on whether a job finished before (earliness), or after (tardiness) the specified due date. The objective is to minimize the total weighted earliness and tardiness penalized costs from the spec...
متن کاملMeta-heuristic approaches for minimizing total earliness and tardiness penalties of single-machine schedulingwith a common due date
This study addresses a class of single-machine scheduling problems involving a common due date where the objective is to minimize the total job earliness and tardiness penalties. A genetic algorithm (GA) approach and a simulated annealing (SA) approach utilizing a greedy local search and three well-known properties in the area of common due date scheduling are developed. The developed algorithm...
متن کاملFuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
Appropriate scheduling and sequencing of tasks on machines is one of the basic and significant problems that a shop or a factory manager encounters; this is why in recent decades extensive studies have been done on scheduling issues. One type of scheduling problems is just-in-time (JIT) scheduling and in this area, motivated by JIT manufacturing, this study investigates a mathematical model for...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & OR
دوره 34 شماره
صفحات -
تاریخ انتشار 2007