Capacitated Lot-sizing with Linked Production Quantities of Adjacent Periods

نویسنده

  • Knut Haase
چکیده

One of the most important tasks operations manager are confronted with is to determine production quantities over a medium-size planning horizon such that demand is met, scarce production facilities are not overloaded and that the sum of holding and setup costs is minimized. For the single machine case the well-known Capacitated Lot-Sizing Problem (CLSP) has been proposed to determine minimum cost solutions. The CLSP is based on the assumption that for each lot produced in a period setup cost is incurred. But in practice the machine setup can be preserved over idle time very often. In such cases the setup cost of a CLSP solution can be reduced by linking the production quantities of an item which is scheduled in two adjacent periods. Therefore we propose the CLSP with linked lot-sizes of adjacent periods. The problem is formulated as a mixed-integer programming model. For the heuristic solution we present a priority rule based scheduling procedure which is backward-oriented, i.e. at rst lot-sizes are xed in the last period, then in the last but one period, and so on. The priority rule consists of a convex combination of estimated holding and setup cost savings. Since the solution quality depends on realisation of the convex combination we perform a simple local search method on the parameter space to obtain low cost solutions. We show by a computational study that our procedure is more eecient than a two stage approach which rst solves the CLSP with the Dixon-Silver or the Kirca-KK okten heuristic and performs linking of lots afterwards.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-level Capacitated Lot-sizing Problem with Safety Stock Deficit and Production Manners: A Revised Simulated Annealing

[1] Corresponding author e-mail: [email protected]   [1] Corresponding author e-mail: [email protected]   Lot-sizing problems (LSPs) belong to the class of production planning problems in which the availability quantities of the production plan are always considered as a decision variable. This paper aims at developing a new mathematical model for the multi-level ca...

متن کامل

Fuzzy Mathematical Model For A Lot-Sizing Problem In Closed-Loop Supply Chain

The aim of lot sizing problems is to determine the periods where production takes place and the quantities to be produced in order to satisfy the customer demand while minimizing the total cost. Due to its importance on the efficiency of the production and inventory systems, Lot sizing problems are one of the most challenging production planning problems and have been studied for many years wit...

متن کامل

A polynomial time algorithm for the single-item lot sizing problem with capacities, minimum order quantities and dynamic time windows

This paper deals with the single-item capacitated lot sizing problem with concave production and storage costs, considering minimum order quantity and dynamic time windows. This problem models a lot sizing where the production lots are constrained in amount and frequency. In this problem, a demand must be satisfied at each period t over a planning horizon of T periods. This demand can be satisf...

متن کامل

Capacitated lot sizing with linked lots for general product structures in job shops

In this paper, we propose a mixed integer programming (MIP) model for a multi-level multi resource capacitated lot sizing and scheduling problem with a set of constraints to track dependent demand balances, that is, the amount left over after allocating the available inventory to the dependent demands. A part of this leftover amount may be kept as a reservation quantity to meet dependent demand...

متن کامل

Capacitated Dynamic Lot Sizing with Capacity Acquisition

One of the fundamental problems in operations management is to determine the optimal investment in capacity. Capacity investment consumes resources and the decision is often irreversible. Moreover, the available capacity level affects the action space for production and inventory planning decisions directly. In this paper, we address the joint capacitated lot sizing and capacity acquisition pro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1993