Vibration and Operation Technical Consideration before Field Balance of Gas Turbine Utilities (In Iran Power Plants SIEMENS V94.2 Gas Turbines)
نویسنده
چکیده
One of the most challenging times in operation of big industrial plant or utilities is the time that alert lamp of Bently Nevada connection in main board substation turn on and show the alert condition of machine. All of the maintenance groups usually make a lot of discussion with operation and together rather this alert signal is real or fake. This will be more challenging when condition monitoring vibrationdata shows 1X(X=current rotor frequency) in fast Fourier transform(FFT) and vibration phase trends show 90 degree shift between two non-contact probedirections with overall high radial amplitude amounts. In such situations, CM (condition monitoring) groups usually suspicious about unbalance in rotor. In this paper, four critical case histories related to SIEMENS V94.2 Gas Turbines in Iran power industry discussed in details. Furthermore, probe looseness and fake (unreal) trip in gas turbine power plants discussed. In addition, critical operation decision in alert condition in power plants discussed in details. Keywords—Gas turbine, field balance, turbine compressors, balancing tools, balancing data collectors.
منابع مشابه
Technical Analysis of Conversion of A Steam Power Plant to Combined Cycle, Using Two Types of Heavy Duty Gas Turbines
Due to long life of steam power plants in Iran, transformation of steam cycles to combined cycles is under consideration. Bandar-Abbas steam power plant with capacity of 320 MW has been analyzed in this work. This old plant is located near the harbor city of Bandar-Abbas at southern Iran. Method of exergy analysis is used to study the current and the repowered systems. Optimum state of the repo...
متن کاملOptimization the Efficiency of Gas Turbines for Air Pollution Reduction
Increasing concerns about energy and emissions from fuel consumption in gas turbines has attracted many researchers to protect the environment and reduce pollutants in the world. The main objective of this paper is to investigate the increasing efficiency of three-stroke gas turbine operation based on the technical analysis of the operation of three-axis gas turbine cycles with non-design condi...
متن کاملOptimization and increase production and efficiency of gas turbines GE-F9 using Media evaporative cooler in Fars combined cycle power plant
Gas turbines play an important role in supplying power for the country especially in peak electricity load. The main disadvantages are the turbines, they produce large changes are a result of climate change. However, in times of peak electricity grid and at the same time warm months, can produce gas turbines under the effect of ambient temperature, the amount of reduced considerably. The method...
متن کاملOptimization of Diverter Box Configuration in a V94.2 Gas Turbine Exhaust System using Numerical Simulation
The bypass exhaust system of a 160 MW combined cycle has been modeled and analyzed using numerical simulation in 2D prospective. Analysis was carried out using the commercial numerical simulation software, FLUENT 6.2. All inputs were based on the technical data gathered from working conditions of a Siemens V94.2 gas turbine, installed in the Yazd power plant. This paper deals with reduction of ...
متن کاملModel-based Approach for Multi-sensor Fault Identification in Power Plant Gas Turbines
In this paper, the multi-sensor fault diagnosis in the exhaust temperature sensors of a V94.2 heavy duty gas turbine is presented. A Laguerre network-based fuzzy modeling approach is presented to predict the output temperature of the gas turbine for sensor fault diagnosis. Due to the nonlinear dynamics of the gas turbine, in these models the Laguerre filter parts are related to the linear d...
متن کامل