A framework for ex ante project risk assessment based on absorptive capacity

نویسندگان

  • Michael J. Cuellar
  • Michael J. Gallivan
چکیده

This paper explores the applicability of the concepts of absorptive capacity and ‘‘ba’’ to ex ante project risk. We develop a hybrid framework to explain knowledge transfer based on these concepts—one that proposes a hybrid transference process. We then apply this framework to develop a methodology and metric for assessing ex ante software project risk, the risk that a new technology introduced into an organization may not be used as designed or may not achieve the anticipated benefits. As a preliminary validation of these concepts, we describe three case studies, employing the framework and metric to show how examining absorptive capacity can help to assess the risk level of software projects. ! 2005 Elsevier B.V. All rights reserved.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An ex ante control chart for project monitoring using earned duration management observations

In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project’s performance indicators, by plotting them on the S...

متن کامل

Organizational Learning and Knowledge Spillover in Innovation Networks: Agent-Based Approach (Extending SKIN Framework)

In knowledge-based economy, knowledge has a public good and non-rivalry nature. Firms build their own knowledge stock not only by means of internal R&D and collaboration with partners, but also by means of previously spilled over knowledge of other firms and public research laboratories (such as universities). Firms based on their absorptive capacity, and level of intra-industry and extra-indus...

متن کامل

Ex-ante Impact Study on the Integrated Natural Resources Management in the Middle East and North Africa Region Rangelands Rehabilitation Project in Iran

The purpose of the Integrated Natural Resources Management program in the Middle East and North Africa Region (MENARID) is to bring national investment projects in the field of Integrated Natural Resource Management (INRM). The impact evaluation study tests whether the selected technology has significantly contributed to restore and maintain of the ecosystem functions and productivity, and whet...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 173  شماره 

صفحات  -

تاریخ انتشار 2006