Optimal Coordination of Automatic Line Switches for Distribution Systems

نویسندگان

  • Ming-Ta Yang
  • Jyh-Cherng Gu
چکیده

For the Taiwan Power Company (Taipower), the margins of coordination times between the lateral circuit breakers (LCB) of underground 4-way automatic line switches and the protection equipment of high voltage customers are often too small. This could lead to sympathy tripping by the feeder circuit breaker (FCB) of the distribution feeder and create difficulties in protection coordination between upstream and downstream protection equipment, identification of faults, and restoration operations. In order to solve the problem, it is necessary to reexamine the protection coordination between LCBs and high voltage customers’ protection equipment, and between LCBs and FCBs, in order to bring forth new proposals for settings and operations. This paper applies linear programming to optimize the protection coordination of protection devices, and proposes new time current curves (TCCs) for the overcurrent (CO) and low-energy overcurrent (LCO) relays used in normally open distribution systems by performing simulations in the Electrical Transient Analyzer Program (ETAP) environment. The simulation results show that the new TCCs solve the coordination problems among high voltage customer, lateral, feeder, bus-interconnection, and distribution transformer. The new proposals also satisfy the requirements of Taipower on protection coordination of the distribution feeder automation system (DFAS). Finally, the authors believe that the system configuration, operation experience, and relevant criteria mentioned in this paper may serve as valuable references for other companies or utilities when building DFAS of their own. OPEN ACCESS Energies 2012, 5 1151

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal Reconfiguration of Distribution Network for Power Loss Reduction and Reliability Improvement Using Bat Algorithm

In power systems, reconfiguration is one of the simplest and most low-cost methods to reach many goals such as self-healing, reliability improvement, and power loss reduction, without including any additional components. Regarding the expansion of distribution networks, communications become more complicate and the number of parameters increases, which makes the reconfiguration problem infeasib...

متن کامل

A Customer Oriented Approach for Distribution System Reliability Improvement using Optimal Distributed Generation and Switch Placement

The reliability of distribution networks is inherently low due to their radial nature, consequently distribution companies (DisCos) usually seek to improve the system reliability indices with the minimum possible investment cost. This can be known as system-oriented reliability planning (SORP). However, there can exist some customers that are not satisfied by their reliability determined by ado...

متن کامل

Optimal Placement of Remote Control Switches in Radial Distribution Network for Reliability Improvement using Particle Swarm Optimization with Sine Cosine Acceleration Coefficients

Abstract: One of the equipment that can help improve distribution system status today and reduce the cost of fault time is remote control switches (RCS). Finding the optimal location and number of these switches in the distribution system can be modeled with various objective functions as a nonlinear optimization problem to improve system reliability and cost. In this article, a particle swarm ...

متن کامل

Optimal DG Allocation and Thyristor-FCL Controlled Impedance Sizing for Smart Distribution Systems Using Genetic Algorithm

Recently, smart grids have been considered as one of the vital elements in upgrading current power systems to a system with more reliability and efficiency. Distributed generation is necessary for most of these new networks. Indeed, in all cases that DGs are used in distribution systems, protection coordination failures may occur in multiple configurations of smart grids using DGs. In different...

متن کامل

Firefly Technique Based on Optimal Congestion Management in an Electricity Market

Nowadays, congestion management is one of the major tasks accomplished by system operators to warrant the operation of transmission system within operating limits. This has resulted in unanticipated congestion interfaces in regional transmission systems. The system is, however, unable to evolve at a rate which is required to meet the quickly changing demand of competitive markets. To make the m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012