The purpose of this paper is to examine the socio-technical structures prevailing in technical organizations. It explores relationships that exist between technical and social structures and imperative project management practices, using statistical techniques. The study investigates links between organization design structures, project management performance, multiple dimensions of project managers’ competencies including personal, business knowledge, interpersonal and managerial competencies and project performance. A systematic teardown approach was adopted for the analysis of various competencies. The statistical analysis technique, ANOVA (Analysis of Variance) was conducted to validate various factors. The results of statistical analysis has shown that organization design structures are not the major determinants, only organizational design structures with functionally structured resource distributions are established as determinants of project management performance. Furthermore, it was proven that the project managers’ competencies have a major influence on project performance. This study will help to improve performance of technical projects and will lay a foundation for the framework of improvement and development of organizations. DOI: 10.4018/jitpm.2013010106 International Journal of Information Technology Project Management, 4(1), 72-87, January-March 2013 73 Copyright © 2013, IGI Global. Copying or distributing in print or electronic forms without written permission of IGI Global is prohibited. INTRODUCTION The complex and unpredictable nature of projects generates serious challenges for the managers involved and project-based organizations (Landaeta, 2008). Managers are finding it even more difficult to balance cost, schedule and performance. They are focusing on devising new ways to deal with these issues (Componation, 2008). Knowledge of managing projects for the development of systems has not kept pace with the increasing complexity and integration of the projects themselves (Sauser & Boardman, 2008). The conventional concepts of project management are shifting to new paradigms. Theorizing project management at the organization level is also being pursued (Artto & Wikstrom, 2005; Crawford, 2006). However, an integrating link at the organizational level that would integrate all parts of project management as a true field of organizational management is still missing (Aubry, Hobbs, & Thuillier, 2007). The Standish Group report in 2000 emphasized on the need to examine and improve interdependencies that exist between various dimensions including: members of a project team, performance measurement systems and the project manager. This study aims to investigate the links that exist between organization design structure, performance measurement systems and project success in technical organizations. According to Kendra and Taplin (2004), the total failure rate of projects came out as 72 percent (Standish Group study, 2000). It was found that 28 percent of IS projects were successful. The study revealed that out of these 28 percent, 97 percent of the projects had dedicated project managers employed. Among these, 58 percent of these projects have deployed a well maintained measurement system. Interestingly it was also found that 46 percent of these projects have used certain project management methodologies within their organization. The study is based on the Socio-Technical System that has been established in literature to improve organizations’ project management performance (Kendra, 2003). The objective is to study the linkages that exist between social, technical structures and performance of technical organizations. Social structures are discussed in terms of organization design structures and project manager competencies as well as technical structures in terms of performance measurement systems. These were first suggested in projects success model (Kendra, 2003) with focus on cultural influence, whereas this study aims to investigate the interdependencies that exist between different factors of socio-technical structures. Past studies on socio-technical system theories, were based on configuration approach with focus on evolution and design of systems (Lock, 2004; Dwyer, 2011; Jenkins, Stanton, Salmon, & Walker, 2011) whereas this study focuses on the interdependencies that exist between different dimensions with which were missing in the previous studies. Thus the implication of model under study, as discussed in detail later in this article, is it will introduce new ways to manage project success without redesign of the existing system. A pilot research on technical organizations revealed that organizations have not closed down their ongoing technical projects, but investment in the new endeavors and extension of operations is discouraged. In these circumstances, it is important for the organizations to analyze their performance and efficiency. The review of literature and discussion from the representatives of technical organizations revealed lack of material and knowledge about technical and social structures in technical organizations. Nevertheless, it was indeed encouraging that the recognition of the importance on the issue exists on all levels including senior management and line managers. However, participants were reluctant to share information regarding their projects and organizations. Thus different channels and techniques were employed to explore different dimensions addressed in this study. With the prevailing scenario in mind, the aim is to explore relationships and interdependencies that exist between technical and social structures 14 more pages are available in the full version of this document, which may be purchased using the "Add to Cart" button on the publisher's webpage: www.igi-global.com/article/linkages-between-organizationdesign-structures/75581
منابع مشابه
Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon
Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...
متن کاملA Comparison of Underground Opening Support Design Methods in Jointed Rock Mass (TECHNICAL NOTE)
It is of great importance to consider long-term stability of rock mass around the openings of underground structure, during design, construction and operation of the said structures in rock. In this context, three methods namely, empirical, analytical and numerical have been applied to design and analyze the stability of underground infrastructure at the Siah Bisheh Pumping Storage Hydro-Electr...
متن کاملStrategic Performance Measurement of Employees based on Project Efficiency and Effectiveness
One of the most important issues in strategic management is enhancing employees’ motivation to contribute in the implementation of strategies; because they usually do not pay necessary attention to strategies. Accordingly, it is required to consider and calculate their roles in implementing strategies. In terms of employees’ role in the organization, they have managerial (goal setter) and/or no...
متن کاملImprovement of project management office performance: An empirical investigation of effective factors in iranian construction industry
Project management office (PMO) is a new emerging concept in Iranian construction industry. Executives expect this organizational unit to add value to the business, and meet the demands of stakeholders by performing specialized tasks ranging from providing project management support to portfolio management. In this regard, PMO managers have long faced the question of how to improve the performa...
متن کاملMulti-criteria approach to project portfolio selection considering structural hardness and correlations between projects
Project portfolio selection is very important subject of decision-makers in project-based organizations. The best assignment of resources to the most appropriate projects is necessary as financing projects with low benefit is just waste of organization's resources. However, existing project selection models pay not much attention the structure and special features of projects as a selection cri...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- IJITPM
دوره 4 شماره
صفحات -
تاریخ انتشار 2013