Multiple Criteria Scheduling Using Genetic Algorithms in a Shipyard Environment

نویسندگان

  • David Todd
  • Pratyush Sen
چکیده

The main aim of scheduling large manufacturing processes is to minimise the time taken to manufacture the product from start to finish, and maximise the utilisation of machinery/ personnel. However, as the number of tasks increases it becomes more difficult to find good schedules within a reasonable time. This paper explains the development of a Multiple Criteria Genetic Algorithm (MCGA) scheduler which evolves good schedules based on several criteria. The system is then demonstrated using a shipyard steel-shop problem. INTRODUCTION In most large scale engineering projects production scheduling plays an important role in making efficient use of resources and reducing manufacturing time. Research in scheduling has traditionally concentrated on using heuristics, ordered search or applying mathematical algorithms. However, as the size of the scheduling task increases so does the difficulty of finding good solutions within a reasonable time. It is common to split the task into a hierarchy (levels of scheduling), where the highest level considers the main events (milestones) and the lowest level is scheduling of workstations. This makes the project more manageable. The high level scheduling is performed first and is used to set targets for the next level down. If these targets cannot be met then re-scheduling occurs. If suitable schedules still cannot be found work may be sub-contracted or resources increased with associated cost penalties. For a major project three or four levels may be required. In the case of Made-To-Order (MTO) products such as offshore structures and specialised marine vehicles there are additional constraints to handle. This increases the complexity even further. It is important to ensure that the processes of design, manufacture and assembly are integrated to their fullest extent to ensure the realisation of appropriate benefits. It is also often the case that orders are governed by strict deadlines with

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling of flexible manufacturing systems using genetic algorithm: A heuristic approach

Scheduling of production in Flexible Manufacturing Systems (FMSs) has been extensively investigated over the past years and it continues to attract the interest of both academic researchers and practitioners. The generation of new and modified production schedules is becoming a necessity in today’s complex manufacturing environment. Genetic algorithms are used in this paper to obtain an initial...

متن کامل

Integrated capacitated transportation and production scheduling problem in a fuzzy environment

Nowadays, several methods in production management mainly focus on the different partners of supply chain management. In real world, the capacity of planes is limited. In addition, the recent decade has seen the rapid development of controlling the uncertainty in the production scheduling configurations along with proposing novel solution approaches. This paper proposes a new mathematical model...

متن کامل

Solving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm

In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...

متن کامل

Scheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics

In this paper, we present a simulated annealing (SA) and a genetic algorithm (GA) based on heuristics for scheduling problem of jobs in virtual cellular manufacturing systems. A virtual manufacturing cell (VMC) is a group of resources that is dedicated to the manufacturing of a part family. Although this grouping is not reflected in the physical structure of the manufacturing system, but machin...