Large Hadron Collider commissioning and first operation.

نویسنده

  • S Myers
چکیده

A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commissioning and Prospects for Early Physics with ALICE

The ALICE detector has been commissioned and is ready for taking data at the Large Hadron Collider. The first proton-proton collisions are expected in 2009. This contribution describes the current status of the detector, the results of the commissioning phase and its capabilities to contribute to the understanding of both pp and PbPb collisions

متن کامل

Commissioning of Ramp and Squeeze at the Lhc

The energy ramp and the betatron squeeze at the CERN Large Hadron Collider (LHC) are particularly critical operational phases that involve the manipulation of beams well above the safe limit for damage of accelerator components. In particular, the squeeze is carried out at top energy with reduced quench limit of superconducting magnets and reduced aperture in the triplet quadrupoles. In 2010, t...

متن کامل

The ALICE muon trigger system: cosmic ray commissioning and first beam-induced events

The ALICE experiment is designed to study strongly interacting nuclear matter which will be produced in heavy ion collisions at the Large Hadron Collider (LHC). The muon spectrometer of the ALICE experiment is equipped with a trigger system based on resistive plate chambers. A commissioning phase was started in 2008 with the detection of cosmic rays and induced particles of the first beam injec...

متن کامل

Commissioning and performance of the ATLAS Inner Detector with the first beam and cosmic data

The ATLAS experiment at the CERN Large Hadron Collider (LHC) started data-taking in Autumn 2008 with the inauguration of the LHC. The Inner Detector is a tracking system for charged particles based on three technologies: silicon pixels, silicon microstrips and drift tubes. The detector was commissioned and calibrated in the ATLAS cavern. Cosmic muons data are used for timing the different compo...

متن کامل

Commissioning and Calibration of the ALICE TPC

ALICE (A Large Ion Collider Experiment) is the dedicated heavy ion experiment at the Large Hadron Collider at CERN. The main tracking device of ALICE is a large volume TPC. The milestones of the TPC commissioning as well as the current status of the detector calibration are presented. The obtained resolutions in transverse momentum, position as well as in specific energy loss (dE/dx) are presen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Philosophical transactions. Series A, Mathematical, physical, and engineering sciences

دوره 370 1961  شماره 

صفحات  -

تاریخ انتشار 2012