Chapter 1: Introduction, Guidelines for the Evaluation and Control of Lead-Based Paint in Public Housing

ثبت نشده
چکیده

I. Legislative Basis and Relationship to Federal Programs and Regulations ............................................................................. 1–4 A. Legislative Basis ................................................................................................... 1–4 B. Relationship to Earlier HUD Guidelines .......................................................... 1–4 C. Intended Audience .............................................................................................. 1–5

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Glossary, Guidelines for the Evaluation and Control of Lead-Based Paint in Public Housing

Abatement: A measure or set of measures designed to permanently eliminate lead-based paint hazards or lead-based paint. Abatement strategies include the removal of lead-based paint, enclosure, encapsulation, replacement of building components coated with lead-based paint, removal of lead-contaminated dust, and removal of lead-contaminated soil or overlaying of soil with a durable covering such ...

متن کامل

Putting the Pieces Together: Controlling Lead Hazards in the Nation's Housing

Title X of the Housing and Community Development Act of 1992 addresses the control of lead-based paint hazards in federally assisted housing. It also provides for consistency and quality control in evaluating and controlling lead hazards in all housing. At the time of sale or rental of privately owned housing built before 1978, the year the Consumer Product Safety Commission banned the resident...

متن کامل

The prevalence of lead-based paint hazards in U.S. housing.

In this study we estimated the number of housing units in the United States with lead-based paint and lead-based paint hazards. We included measurements of lead in intact and deteriorated paint, interior dust, and bare soil. A nationally representative, random sample of 831 housing units was evaluated in a survey between 1998 and 2000; the units and their occupants did not differ significantly ...

متن کامل

HOW MUCH CLEANING IS ENOUGH? AN EVALUATION OF ALTERNATIVE POST-LEAD HAZARD INTERVENTION CLEANING PROCEDURES By:

This study evaluated and compared two procedures to clean lead dust and debris after lead hazard control activities were completed in housing with lead-based paint hazards. 1995 Federal guidelines prepared by the U.S. Department of Housing and Urban Development for the control of lead-based paint hazards in housing strongly recommend that after lead hazard control interventions all walls, ceili...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1996