A Cost-based Interior Design Decision Support System for Large-scale Housing Projects

نویسندگان

  • Hoon-ku Lee
  • Yoon-sun Lee
  • Jae-jun Kim
چکیده

In the early stages of a large-scale housing project, many interior design alternatives remain to be confirmed after a rough review of the costs. The project participants move on to the later stages of budgeting and construction without the exact information on the interior costs, and several occasions may arise when costs increase or time delays occur, driven by interior design specification changes resulting from the client’s evolving demands during construction. Therefore, it is necessary to determine the costs during the decision-making process for interior design items in an apartment unit plan. This study implements a decision support system for a large-scale apartment building project in which the clients can make cost-based decisions that meet their requirements, while the builders can control both resource planning and interior design construction costs. To perform a cost review for a housing project with a uniform apartment plan, it is necessary to manage the information for the basic apartment plan constituting the interior information. In this study, we developed an information model to support cost-based decision making in the interior design phase. An interior design object library was developed by analysing the relationship of the housing project hierarchy and interior information attributes. The proposed model was validated in an example study to show that the model could support the decision-making process of various project participants by providing real-time cost information when the interior design was created or changed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

Concurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation

Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...

متن کامل

GA-based decision support system for housing condition assessment and refurbishment strategies

Refurbishment work involves improvement, adaptation, upgrading, renovation, modernization, retrofit, and repair of existing housing. With limited land usage and being aware of sustainability, the refurbishment market has faced increasing needs worldwide in the last decade. Refurbishment projects on existing housing, however, have complex and uncertain characteristics that are recognized to be m...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2007