A Max-Min Ant System algorithm to solve the Software Project Scheduling Problem

نویسندگان

  • Broderick Crawford
  • Ricardo Soto
  • Franklin Johnson
  • Eric Monfroy
  • Fernando Paredes
چکیده

Article history: Available online 14 May 2014

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

طراحی بهینه ابعاد شبکه جمع‌آوری فاضلاب با استفاده از الگوریتم بهینه‌سازی جامعه مورچگان: مقایسه عملکرد چهار الگوریتم

In this paper, the features of Ant Colony Optimization Algorithm (ACOA) are used to find optimal size for sewer network. Two different formulations are proposed. In the first formulation, pipes diameters and in the second formulation, nodal elevations of sewer network are taken as decision variables of the problem. In order to evaluate the performance of different ACOAs, four algorithms of Ant ...

متن کامل

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...

متن کامل

Modified Pareto archived evolution strategy for the multi-skill project scheduling problem with generalized precedence relations

In this research, we study the multi-skill resource-constrained project scheduling problem, where there are generalized precedence relations between project activities. Workforces are able to perform one or several skills, and their efficiency improves by repeating their skills. For this problem, a mathematical formulation has been proposed that aims to optimize project completion time, reworki...

متن کامل

Parallel Min-max Ant Colony System (mmas) for Dynamic Process Scheduling in Distributed Operating Systems Considering Load Balancing

This paper presents and evaluates a new method for process scheduling in distributed systems .Scheduling in distributed operating systems has a significant role in overall system performance and throughput. An efficient scheduling is vital for system performance .The scheduling in distributed systems is known as an NPcomplete problem, even in the best conditions, and methods based on heuristic ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Expert Syst. Appl.

دوره 41  شماره 

صفحات  -

تاریخ انتشار 2014