Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction

نویسندگان

  • Yoonseok Shin
  • Hunhee Cho
  • Kyung-In Kang
چکیده

a r t i c l e i n f o Temporary hoist planning is a key factor for successful project completion in a high-rise building construction. Inadequate plans for hoists in the early stages of a project can cause problems such as failing to hoist resources as required or leaving hoists idle. There are two existing approaches, simple formulas and simulation techniques, for planning temporary hoists. However, simple formulas cannot treat hoist arrangements consisting of different kinds of hoists, while the simulation technique is both time-consuming and tedious when there are many alternatives. In this study, a discrete-event simulation model incorporating genetic algorithms is proposed to support hoist planners while preparing optimal plans with minimal time and effort for high-rise building construction. To verify the applicability of the proposed model, it was applied to a real project and gave better results than a previous approach to temporary hoist planning. Over the past decade, the number of high-rise buildings constructed and their heights have increased. The report of the Council on Tall Buildings and Urban Habitat (CTBUH) by Oldfield and Wood [1] shows that the average height of the ten tallest buildings completed each year in the world has been increasing each decade: from about 150 m in 1960 to about 420 m in 2009. Developments in materials technology and structural engineering, and the necessity for efficient space utilization caused by increasing land prices and the problem of overpopulation in urban areas will maintain this trend until at least 2020. In high-rise building construction, adequate planning of temporary hoists is a key factor for successful project completion. Hoists, together with cranes, are essential equipment for vertical transportation of construction resources, such as manpower and materials [2]. Too few hoists can cause productivity losses by failing to hoist resources in a timely fashion. On the other hand, too many hoists can incur unnecessary costs when hoists are idle. Higher buildings require more resources and have longer transportation distances. Thus, high-rise building construction has the disadvantage of longer lifting times for workers and materials compared with shorter cycle times in low-story construction. Thus, in high-rise building construction, creating adequate plans for temporary hoists is becoming a more difficult task. Planning for temporary hoists usually depends on heuristic methods, i.e., simple formulas modified by the subjective opinions of experienced practitioners. However, this heuristic method carries the risk of making inappropriate decisions that potentially …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Prediction Model for Hoisting Time Using Luffing-type Crane for High-rise Building Construction

Hoisting planning for systematic and efficient vertical transportation is one of the key factors for successful completion in high-rise building construction. However, despite this importance, minimal research has been carried out for predicting hoist time, which is a key player in hoisting planning. Therefore, this study proposed a prediction model for vertical hoisting time using a luffing-ty...

متن کامل

Contour Crafting Process Plan Optimization Part II: Multi–Machine Cases

Contour Crafting is an emerging technology that uses robotics to construct free form building structures by repeatedly laying down layers of material such as concrete. The Contour Crafting technology scales up automated additive fabrication from building small industrial parts to constructing buildings. Tool path planning and optimization for Contour Crafting benefit the technology by increasin...

متن کامل

Simulation of Smoke Emission from Fires in High-Rise Buildings Using the 3D Model Generated from 2-Dimensional Cadastral Data

Having a 3-Dimensional model of high-rise buildings can be used in disaster management such as fire cases to reduce casualties. The fundamental dilemma in 3D building modeling is the unavailability of suitable data sources. However, available cadastral 2D maps could be used as low-cost and attainable resources for 3D building modeling. Smoke will be a great threat to people's health during a f...

متن کامل

Contour Crafting Process Plan Optimization Part I: Single-Nozzle Case

Contour Crafting is an emerging technology that uses robotics to construct free form building structures by repeatedly laying down layers of material such as concrete. The Contour Crafting technology scales up automated additive fabrication from building small industrial parts to constructing buildings. Tool path planning and optimization for Contour Crafting benefit the technology by increasin...

متن کامل

Investigating the role of high-rise building shell elements in reducing energy consumption (case example: Isfahan Cascade doctors' residential towers)

Significant energy is used to provide and maintain environmental conditions for thermal comfort in high-rise residential buildings, which largely depends on the components of the shell design. Therefore, to achieve high amounts of energy savings in buildings, high-impact design measures must first be defined and then optimized. This study seeks to answer the question of how the components of th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015