Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain
نویسندگان
چکیده
Industrial buyers of capital facilities have experienced and continue to experience pressure to reduce facility design and construction lead time. This pressure arises both internally (due to successes in manufacturing lead time reductions) and externally (due to competitive forces including narrowing product delivery windows). This paper presents a case study detailing one owner’s efforts to reduce the length and variability of delivery time for long-lead construction materials in order to improve overall project lead time. The owner adopted a long-term multiproject perspective, procuring material in advance of specific projects and holding it at a position in the supply chain selected to allow flexibility for customization. Reduction in lead time of 75% from order to delivery of the material resulted for individual projects within the owner’s capital plan. As a result, the material was available at the construction site well in advance of its need for erection. To study if holding material at alternative locations in the supply chain could provide a better match between delivery quantities and the demand for erection, the supply chain was simulated. In this case study, demand information was imprecise, allowing only the quantity of material delivered to be considered rather than matching specific items to specific locations. Nonetheless, the results demonstrate the utility of simulation in the capital projects supply chain and the value of improving demand forecasts. DOI: 10.1061/(ASCE)0733-9364(2004)130:6(818) CE Database subject headings: Construction management; Project management; Inventories; Simulation.
منابع مشابه
Optimal replenishment and credit policy in supply chain inventory model under two levels of trade credit with time- and credit-sensitive demand involving default risk
Traditional supply chain inventory modes with trade credit usually only assumed that the up-stream suppliers offered the down-stream retailers a fixed credit period. However, in practice the retailers will also provide a credit period to customers to promote the market competition. In this paper, we formulate an optimal supply chain inventory model under two levels of trade credit policy with d...
متن کاملLead Time Reduction via Pre-positioning of Inventory in an Industrial Construction Supply Chain
Lead time reduction is a key concern of many industrial buyers of capital facilities given current economic conditions. Supply chain initiatives in manufacturing settings have led owners to expect that dramatic reductions in lead time are possible in all phases of their business, including the delivery of capital materials. Further, narrowing product delivery windows and increasing pressure to ...
متن کاملSupplier Selection in Three Echelon Supply Chain & Vendor Managed Inventory Model Under Price Dependent Demand Condition
This paper, considers the supplier selection in three echelon supply chain with Vendor Managed Inventory (VMI) strategy under price dependent demand condition. As there is a lack of study on the supplier selection in VMI literature, this paper presents a VMI model in supply chain including multi supplier, one distributer and multi retailer that distributer selects suppliers. Two class models (t...
متن کاملDetermination of a Desirable Inventory Policy in a three Echelon Multilayer Supply Chain with Normal Demand
Inventory control is one of the most important issues in supply chain management. In this paper, a three-echelon production, distribution, inventory system composed of one producer, a set of wholesalers and retailers is considered. Costumers' demands can be approximated by a normal distribution and the inventory policy is a kind of continuous review (R, Q). In this paper, a model based on stand...
متن کاملFacility Location and Inventory Balancing in a Multi-period Multi-echelon Multi-objective Supply Chain: An MOEA Approach
A comprehensive and integrated study of any supply chain (SC) environment is a vital requirement that can create various advantages for the SC owners. This consideration causes productive managing of the SC through its whole wide components from upstream suppliers to downstream retailers and customers. On this issue, despite many valuable studies reported in the current literature, considerabl...
متن کامل