Optimizing the Operation Sequence of a Chip Placement Machine Using TSP Model
نویسندگان
چکیده
Surface mount component placement machines are being widely used in electronic manufacturing industry for automated placement of components on printed wire boards (PWBs). Their performance is determined by their board assembly time. Factors that determine this include the machine’s architecture and placement sequence algorithm, and component locations on the board. For a given machine and a board, the assembly time can be improved by optimizing the placement sequence algorithm. This paper presents a formulation and solution of the assembly time optimization problem for the FUJI FCP-IV component placement machine. The formulation gives a mathematical description of the assembly time that can be optimized as an integer programming problem. A near-optimal solution that can be obtained in a computationally efficient manner has been obtained by relaxing the problem to an instance of traveling salesman problem (TSP). Simulation has been conducted on some actual boards and the results have been compared with those obtained by the actual runs at Lexmark, Inc., Lexington, KY. This shows that significant reduction in component placement time can be achieved by the proposed optimization algorithm.
منابع مشابه
Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملOptimal Operation of a DWC by Self-Optimizing Control: Active Vapor Split Approach
Dividing Wall Column(DWC) offers the large potential for operating and capital cost saving in compared with conventional distillation sequence. In the studied DWC in this study, the aid of Vmin diagrams, it is shown that without a suitable value for vapor split fraction bellow the dividing wall in different operating conditions, the energy requirement increases from optimal value and it wil...
متن کاملVirtual manufacturing cells scheduling considering lotstreaming and sequence dependent setup times
In this paper, a new mathematical model for the problem of job scheduling in virtual manufacturing cells (VMC) is presented to minimizing the completion time of all jobs. Sequence dependent setup times of machines is considered and lot-streaming is possible. In Virtual manufacturing cells, each job has a different processing path and there is a set of machines for processing each operation. The...
متن کاملA Routing-Aware Simulated Annealing-based Placement Method in Wireless Network on Chips
Wireless network on chip (WiNoC) is one of the promising on-chip interconnection networks for on-chip system architectures. In addition to wired links, these architectures also use wireless links. Using these wireless links makes packets reach destination nodes faster and with less power consumption. These wireless links are provided by wireless interfaces in wireless routers. The WiNoC archite...
متن کاملSingle-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کامل