Performance of the Main Ring Bpm during the Beam Commissioning at J-parc

نویسندگان

  • T. Toyama
  • D. Arakawa
  • S. Hiramatsu
  • S. Igarashi
  • S. Lee
  • H. Matsumoto
  • J. Odagiri
  • M. Tejima
  • Y. Hashimoto
  • M. Okada
  • K. Satou
  • J. Takano
  • N. Hayashi
  • K. Hanamura
  • S. Hatakeyama
چکیده

Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation, (3) test of beam based alignment.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Operating Experience of the J-PARC Linac

The beam commissioning of the J-PARC linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent Main Ring Synchrotron and the neutron target commissioning. The linac uses a Cs-free LaB6-driven ion source and 20 units of 324 MHz klystrons. A...

متن کامل

Performance of the Beam Position Monitor System for the SLAC PEP-II B Factory

the beam position monitor (BPM) system for the SLAC PEP-II B Factory was designed to measure the positions of single-bunch single-turn to multibunch multi-turn beams in both rings of the facility. Each BPM is based on four button-style pickups. At most locations the buttons are connected to provide single-axis information (x only or y only). Operating at a harmonic (952 MHz) of the bunch spacin...

متن کامل

Experience with the Beam Position Monitor System of the Bessy Ii Storage Ring

The beam position monitor (BPM) system has been developed at BESSY and operates in 3 different modes: the closed orbit, the single turn, and the diagnostics mode. Details of the BPM system are presented together with the result of some bench tests. The commissioning of the system was done primarily with beam-based techniques and is described in more detail. First measurements of fast and slow b...

متن کامل

The New Bpm System and Its Commissioning at Pf Ring

We describe the new beam position monitor (BPM) system built for the brilliance-upgraded Photon Factory storage ring. The new system was designed to enable precise and fast measurements to correct the closed orbit distortion (COD), as well as to feed back the orbit position during user-runs. There are 42 BPMs newly installed, amounting to a total of 65 BPMs. All of the newly installed BPMs are ...

متن کامل

RHIC Instrumentation

The Relativistic Heavy Ion Collider (RHIC) consists of two 3.8 km circumference rings utilizing 396 superconducting dipoles and 492 superconducting quadrupoles. Each ring will accelerate approximately 60 bunches of 10 protons to 250 GeV, or 10 fully stripped gold ions to 100 GeV/nucleon. Commissioning is scheduled for early 1999 with detectors for some of the 6 intersection regions scheduled fo...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010