Schedule Multiple Highway Construction Projects

نویسنده

  • Arlys Silva
چکیده

The scheduling of numerous construction projects considering several factors is an important challenge faced by construction companies, particularly road builders. Road builders need to make decision to identify the best possible schedule to complete multiple constructions while considering multiple factor such as maximizing profit, reducing risk, and resource constraints among many other factors.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

Bi-objective Network Optimization for Spatial and Temporal Coordination of Multiple Highway Construction Projects

Even though highway Construction and Maintenance (C/M) projects aim to improve transportation infrastructure and travel services, these highway C/M projects become one of the main reasons for causing traffic congestion on existing road transportation systems as well as traffic accidents in work zone areas. The number of work zones is increasing due to the aging infrastructure, which demands spa...

متن کامل

A MULTI-OBJECTIVE DECENTRALIZED MULTIPLE CONSTRUCTION PROJECTS SCHEDULING PROBLEM CONSIDERING PERIODIC SERVICES AND ORDERING POLICIES

In decentralized construction projects, costs are mostly related to investment, material, holding, logistics, and other minor costs for implementation. For this reason, simultaneous planning of these items and appropriate scheduling of activities can significantly reduce the total costs of the project undertaken. This paper investigates the decentralized multiple construction projects schedulin...

متن کامل

Highway Interchanges: Construction Schedule and Traffic Planning Visualization

Highway Interchange projects present particularly complex and changing geometric configurations. Such configurations are hard to visualize and understand, and associated management, construction decisions, and traffic control strategies are difficult to optimize and communicate. This paper presents a computerbased system, which utilizes 3D and 4D CAD technology in order to: facilitate the commu...

متن کامل

Current State of Highway Projects Planning and Scheduling

Highway projects involve huge capital investments and prolonged durations. A number of researchers have developed various computer-based tools and techniques to help planners prepare plans and schedules based on their specific needs. CPM is the predominant scheduling method used in construction industry. However, its inability to efficiently plan and schedule repetitive projects such as highway...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016