Comparison of Construction Alternatives Using Matched Simulation Experiments
نویسندگان
چکیده
The comparison of alternative construction methods is one of the principal reasons for using simulation to model construction processes. The efficiency and effectiveness of such comparisons can be greatly improved by the prudent use of “matched pairs,” a variance reduction technique based on dedicated and fully synchronized random number streams. The basic methodology is illustrated by using the STROBOSCOPE simulation system to compare two alternative construction methods for rock tunneling [Conventional versus the New Austrian Tunneling Method (NATM)]. For this example the effects are dramatic. The probability of identifying and choosing the cheaper construction method based on a single run increases from 55% to 96%, the variance of the cost difference decreases by two orders of magnitude, and the 95% confidence interval for the true cost difference given by 4,000 independent runs can be obtained by performing only seven replications using matched pairs. Besides this improvement in statistical efficiency, the use of matched pairs is a necessity for this example in order to compare the alternatives on a logical and
منابع مشابه
Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects
Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...
متن کاملیک روش ابتکاری برای تجزیه و تحلیل خط مونتاژ برمبنای شبیهسازی و طراحی آزمایشها
A heuristic method based on simulation and design of experiments for performance improvement of assembly line is presented in this paper. In the proposed method, all effective factors on the performance of an assembly line are specified using the expert's point of view and then a 2k factorial design is used for the selection of the most effective factors. Also a factorial design is applied for ...
متن کاملEarthen architecture, an alternative to construction industry to manage the drought crisis in Iran: Comparison between water usage in a building with three type of loading system: steel, concrete, and earth
Abstract: Iran faces water shortage crisis whilst construction industry consumes huge amount of water. There are not precise data about construction industry water consumption. Accordingly, lack of comparison as well as prioritization between prevalent structural systems and alternatives which probably use less water create problems in planning for less consumption. There are two questions whi...
متن کاملEvaluation of Alternative Construction Processes Using Simulation
The comparison of alternative construction methods is one of the principal reasons for using simulation to model construction processes. The efficiency and effectiveness of such comparisons can be greatly improved by the prudent use of “matched pairs,” a variance reduction technique based on dedicated and fully synchronized random number streams. The basic methodology is illustrated by using th...
متن کاملExplain the optimal pattern in the contracts of public private Participation construction, exploitation and transfer (BOT) Applied to Contracts Theory
In recent decade in developing countries, lack of government budget or lack of access to modern technology, persuade governments to attract private sector participation in the economy. One of the most common methods is Public-Private Partnership agreements. The real implementation of this type of partnership needs to set contracts that satisfies preferences of both parties. This research aims t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2014