Design of SCADA water resource management control center by a bi-objective redundancy allocation problem and particle swarm optimization
نویسندگان
چکیده
SCADA is an essential system to control critical facilities in big cities. SCADA is utilized in several sectors such as water resource management, power plants, electricity distribution centers, traffic control centers, and gas deputy. The failure of SCADA results in crisis. Hence, the design of SCADA system in order to serve a high reliability considering limited budget and other constraints is essential. In this paper, a bi-objective redundancy allocation problem (RAP) is proposed to design Tehran's SCADA water resource management control center. Reliability maximization and cost minimization are concurrently considered. Since the proposed RAP is a non-linear multi-objective mathematical programming so the exact methods cannot efficiently handle it. A multi-objective particle swarm optimization (MOPSO) algorithm is designed to solve it. Several features such as dynamic parameter tuning, efficient constraint handling and Pareto gridding are inserted in proposed MOPSO. The results of proposed MOPSO are compared with an efficient ε-constraint method. Several non-dominated designs of SCADA system are generated using both methods. Comparison metrics based on accuracy and diversity of Pareto front are calculated for both methods. The proposed MOPSO algorithm reports better performance. Finally, in order to choose the practical design, the TOPSIS algorithm is used to prune the Pareto front. & 2014 Elsevier Ltd. All rights reserved.
منابع مشابه
Solving a new bi-objective model for a cell formation problem considering labor allocation by multi-objective particle swarm optimization
Mathematical programming and artificial intelligence (AI) methods are known as the most effective and applicable procedures to form manufacturing cells in designing a cellular manufacturing system (CMS). In this paper, a bi-objective programming model is presented to consider the cell formation problem that is solved by a proposed multi-objective particle swarm optimization (MOPSO). The model c...
متن کاملDeveloping a bi-objective optimization model for solving the availability allocation problem in repairable series–parallel systems by NSGA II
Bi-objective optimization of the availability allocation problem in a series–parallel system with repairable components is aimed in this paper. The two objectives of the problem are the availability of the system and the total cost of the system. Regarding the previous studies in series–parallel systems, the main contribution of this study is to expand the redundancy allocation problems to syst...
متن کاملA Multi-Objective Particle Swarm Optimization Algorithm for a Possibilistic Open Shop Problem to Minimize Weighted Mean Tardiness and Weighted Mean Completion Times
We consider an open shop scheduling problem. At first, a bi-objective possibilistic mixed-integer programming formulation is developed. The inherent uncertainty in processing times and due dates as fuzzy parameters, machine-dependent setup times and removal times are the special features of this model. The considered bi-objectives are to minimize the weighted mean tardiness and weighted mean co...
متن کاملIntegrated modeling and solving the resource allocation problem and task scheduling in the cloud computing environment
Cloud computing is considered to be a new service provider technology for users and businesses. However, the cloud environment is facing a number of challenges. Resource allocation in a way that is optimum for users and cloud providers is difficult because of lack of data sharing between them. On the other hand, job scheduling is a basic issue and at the same time a big challenge in reaching hi...
متن کاملSet a bi-objective redundancy allocation model to optimize the reliability and cost of the Series-parallel systems using NSGA II problem
With the huge global and wide range of attention placed upon quality, promoting and optimize the reliability of the products during the design process has turned out to be a high priority. In this study, the researcher have adopted one of the existing models in the reliability science and propose a bi-objective model for redundancy allocation in the series-parallel systems in accordance with th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Rel. Eng. & Sys. Safety
دوره 133 شماره
صفحات -
تاریخ انتشار 2015