The left edge algorithm in block test scheduling under power constraints

نویسندگان

  • Valentin Muresan
  • Xiaojun Wang
  • Mircea Vladutiu
چکیده

A left-edge algorithm approach is proposed in this paper to deal with the problem of unequal-length block-test scheduling under power dissipation constraints. An extended tree growing technique is also used in combination with the left-edge algorithm in order to improve the test concurrency under power dissipation limits. Test scheduling examples and experiments are discussed highlighting further research directions toward an efficient systemlevel test scheduling algorithm.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A comparison of classical scheduling approaches in power-constrained block-test scheduling

Classical scheduling approaches are applied here to overcome the problem of unequal-length block-test scheduling under power dissipation constraints. List schedulinglike approaches are proposed j r s t as greedy algorithms to tackle the fore mentioned problem. Then, distributiongraph based approaches are described in order to achieve balanced test concurrency and test power dissipation. An exte...

متن کامل

Power-Constrained Block-Test List Scheduling

A list scheduling approach is proposed in this paper to overcome the problem of unequal-length block-test scheduling under power dissipation constraints. An extended tree growing technique is also used in combination with the list scheduling algorithm in order to improve the test concurrency having assigned power dissipation limits. Moreover, the algorithm features a power dissipation balancing...

متن کامل

Distribution-graph based approach and extended tree growing technique in power-constrained block-test scheduling

A distribution-graph based scheduling algorithm is proposed together with an extended tree growing technique to deal with the problem of unequal-length block-test scheduling under power dissipation constraints. The extended tree growing technique is used in combination with the classical scheduling approach in order to improve the test concurrency having assigned power dissipation limits. Its g...

متن کامل

A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

متن کامل

Minimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints

In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000