Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines

نویسندگان

  • Marcos Furlan
  • Bernardo Almada-Lobo
  • Maristela Oliveira Santos
  • Reinaldo Morabito
چکیده

This paper addresses the lot-sizing and scheduling problem of pulp and paper mills involving multiple paper machines. The underlying multi-stage integrated production process considers the following critical units: continuous digester, intermediate stocks of pulp and liquor, multiple paper machines and a recovery line to treat by-products. This work presents a mixed integer programming (MIP) model to represent the problem, as well as a solution approach based on a customized genetic algorithm (GA) with an embedded residual linear programming model. Some GA tools are explored, including literature and new operators, a novel diversification process and other features. In particular, the diversification process uses a new allele frequency measure to change between diversification and intensification procedures. Computational results show the effectiveness of the method to solve relatively large instances of the single paper machine problem when compared to other single paper machine solution methods found in the literature. For multiple paper machine settings, in most runs the GA solutions are better than those obtained for the MIP model using an optimization software.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem

Traditional scheduling problems with the batch processing machines (BPM) assume that machines are continuously available, and no time is needed for their preventive maintenance (PM). In this paper, we study a realistic variant of flowshop scheduling which integrates flow shop batch processing machines (FBPM) and preventive maintenance for minimizing the makespan. In order to tackle the given pr...

متن کامل

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....

متن کامل

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

A Genetic Based Scheduling Algorithm for the PHSP with Unequal Batch Size Inbound Trailers

This paper considers the parcel hub scheduling problem (PHSP) with unequal batch size inbound trailers, which is a combinatorial optimization problem commonly found in a parcel consolidation terminal in the parcel delivery industry (PDI). The problem consists of processing a large number of inbound trailers at a much smaller number of unload docks. The parcels in the inbound trailers must be un...

متن کامل

A New model for integrated lot sizing and scheduling in flexible job shop problem

In this paper an integrated lot-sizing and scheduling problem in a flexible job shop environment with machine-capacity-constraint is studied. The main objective is to minimize the total cost which includes the inventory costs, production costs and the costs of machine’s idle times. First, a new mixed integer programming model,with small bucket time approach,based onProportional Lot sizing and S...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 59  شماره 

صفحات  -

تاریخ انتشار 2015