The impact of simplification in a sequential rule-based model of activity-scheduling behavior
نویسندگان
چکیده
The aim of this paper is to gain a better understanding of the impact of simplification on a sequential model of activity-scheduling behavior which uses feature-selection methods. To that effect, the predictive performance of the Albatross model, which incorporates nine different facets of activity ^ travel behavior, based on the original full decision trees, is compared with the performance of the model based on trimmed decision trees. The results indicate that significantly smaller decision trees can be used for modeling the different choice facets of the sequential model system without losing much in predictive power. The performance of the models is compared at three levels: the choice-facet level, the activity-pattern level (comparing the observed and generated sequences of activities), and the trip-matrix level, comparing the correlation coefficients that determine the strength of the associations between the observed and the predicted origin ^ destination matrices. The results indicate that the model based on the trimmed decision trees predicts activity-diary schedules with a minimum loss of accuracy at the decision level. Moreover, the results indicate a slightly better performance at the activity-pattern and the trip-matrix level. DOI:10.1068/a36167
منابع مشابه
Reliability Based Optimal Preventive Maintenance Policy for High Voltage Circuit Breakers in Power Plants
Electric power industry have always try to provide reliable electricity to customers and at the same time decrease system costs. High Voltage circuit-breakers are an essential part of the power network. This study has developed a maintenance and replacement scheduling model for high voltage circuit- breakers that minimize maintenance costs while maintaining the acceptable reliability. This mo...
متن کاملA Simulation-Based Optimization Model for Scheduling New Product Development Projects in Research and Development Centers
a simulation-based optimization approach for the purpose of finding a near-optimal answer can be efficient and effective. In the present paper, first, the mathematical model for the project activity scheduling problem has been presented with a job shop approach. Then, using the Arena 14 software, the simulation model has been designed. Consequently, a numerical example has been solved via runni...
متن کاملAn Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones
Project scheduling Net present value We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a t...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...
متن کاملSequential-Based Approach for Estimating the Stress-Strength Reliability Parameter for Exponential Distribution
In this paper, two-stage and purely sequential estimation procedures are considered to construct fixed-width confidence intervals for the reliability parameter under the stress-strength model when the stress and strength are independent exponential random variables with different scale parameters. The exact distribution of the stopping rule under the purely sequential procedure is approximated ...
متن کامل