Dam-break Flood Risk Management. an Integrated Project

نویسنده

  • A. Betâmio de Almeida
چکیده

Contemporary dam safety regulations include risk assessment at downstream flood plains and consideration of potential damages due to dam rupture, regardless of the expected probability of occurrence of such event. The aim of these kind of procedures is to increase the safety level along the valley against abnormal floods caused by dam accidents. Emergency plans for downstream flood plains, including zoning, warning and evacuation plans, are being developed as special risk mitigation procedures. In modern open societies these plans should include public information and training. All these valley actions will be justified in order that the global safety level be increased, not only in objective terms by increasing the survival probability, but also in subjective terms. In fact, public risk perception is a very important dimension in any risk management methodology. For dam and valley safety policy, public participation and perception becomes more and more a very important issue. Among the different complex aspects of this topic, the ethical questions related to risk assessment and management as well as with the risk communication need to be considered. Risk public perception is one of the variables that must to be introduced in the emergency planning. To study, develop and improve an integrated methodology for dams and valley risk management in Portugal, a special project is under development, since 1994. This project is sponsored by NATO, through its Science for Stability Program. The main objectives of the project were the following ones: − to improve the computational capacity to simulate dam-break floods (one and two-dimensional models), including validation procedures based on physical and experimental models; − to improve the portuguese dam safety legislation in what concerns downstream valleys; − to introduce the applied social sciences in risk management methodologies, specially in what concerns risk public risk perception and information and the land-use management during dam lifetime; − to develop new decision tools to aid dam and valley risk management based on advanced computer technologies (SIG and multimedia databases); − to develop a guideline for valley emergency plans and a full scale exercise. The project was organized in five sub-projects that were being working in order to reach the objectives. The work was based on a theoretical and applied works for a case study, including valley with two dams: Arade valley at Algarve, in the south of Portugal, where two dams are in operation upstream two cities. The paper will briefly describe the main concepts and developments achieved by this NATO project including the conclusions and the practical consequences and measures that are being implemented in Portugal.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Management System for Dam-Break Hazard Mapping in a Complex Basin Environment

Flood disasters from dam breaks cause serious loss of human life and immense damage to infrastructure and economic stability. The application of Geographic Information System technology integrated with hydrological modeling for mapping flood-inundated areas and depth can play a momentous role in further minimizing the risk and possible damage. In the present study, base terrain data, hydrologic...

متن کامل

Potential Impact of Climate Changes on the Inundation Risk Levels in a Dam Break Scenario

The overall objective of the study is to generate information for an enhanced land use planning with respect to flood hazards. The study assesses the potential impact of climate change by simulating a dam break scenario in a high intensity rainfall event and evaluates the vulnerability risk in the downstream region by integrating ArcGIS and Hydrologic Engineering Centers River Analysis System (...

متن کامل

Risk assessment of a dam-break using GIS technology.

Flood disasters cause massive loss of human lives and immense damage to the infrastructure and economic activities, not only in Turkey but also all over the world. Governments consider several long-term and short-term precautions for flood control. The numerical simulation of dam-break problems could be accomplished with geographic information systems and innovation maps. Spread of the flood wa...

متن کامل

A Mathematical Model for Forecasting the Dam-Break Flood Routing Process of a Landslide Dam

Once a landslide dam bursts, its reservoir discharges quickly in a flood which will cause catastrophic damage to life and property downstream. For a specific landslide dam, the peak flow rate and the evolution of downstream flood are influenced by the shape and size of the dike breach when dam-break occurs. According to the general nature of landslide dams and field observations of dike-breach ...

متن کامل

Zoar Levee Interim Risk Management

The U.S. Army Corps of Engineers elevated Zoar Levee and Diversion Dam to a Dam Safety Action Class I (urgent and compelling) ranking due to seepage concerns. An accelerated program is in progress to address project deficiencies which include seepage through the levee’s glacial outwash foundation, through a fractured rock knoll beneath the levee, and through the dam’s fractured rock abutments a...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2005