Roadheader applications in mining and tunneling industries

نویسندگان

  • H. Copur
  • L. Ozdemir
  • J. Rostami
چکیده

Roadheaders offer a unique capability and flexibility for the excavation of soft to medium strength rock formations, therefore, are widely used in underground mining and tunneling operations. A critical issue in successful roadheader application is the ability to develop accurate and reliable estimates of machine production capacity and the associated bit costs. This paper presents and discusses the recent work completed at the Earth Mechanics Institute of Colorado School of Mines on the use of historical data for use as a performance predictor model. The model is based on extensive field data collected from different roadheader operations in a wide variety of geologic formations. The paper also discusses the development of this database and the resultant empirical performance prediction equations derived to estimate roadheader cutting rates and bit consumption.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Application of Soft Computing Methods for the Estimation of Roadheader Performance from Schmidt Hammer Rebound Values

Estimation of roadheader performance is one of the main topics in determining the economics of underground excavation projects. The poor performance estimation of roadheader scan leads to costly contractual claims. In this paper, the application of soft computing methods for data analysis called adaptive neuro-fuzzy inference system- subtractive clustering method (ANFIS-SCM) and artificial  neu...

متن کامل

Geological Hazards analysis in Urban Tunneling by EPB Machine (Case study: Tehran subway line 7 tunnel)

Technological progress in tunneling has led to modern and efficient tunneling methods in vast underground spaces even under inappropriate geological conditions. Identification and access to appropriate and sufficient geological hazard data are key elements to successful construction of underground structures. Choice of the method, excavation machine, and prediction of suitable solutions to over...

متن کامل

TBM Tunneling Construction Time with Respect to Learning Phase Period and Normal Phase Period

In every tunnel boring machine (TBM) tunneling project, there is an initial low production phase so-called the Learning Phase Period (LPP), in which low utilization is experienced and the operational parameters are adjusted to match the working conditions. LPP can be crucial in scheduling and evaluating the final project time and cost, especially for short tunnels for which it may constitute a ...

متن کامل

BENEFICIATION STUDIES ON BAUXITE MINING WASTE: A VALUE ADDITION FOR REFRACTORYINDUSTRIES

Partially Lateritised Khondalite (PLK) rocks are the waste materials generated as a result of mining of bauxite. The major discolouring elemental impurity in the PLK is iron oxides, which render it unsuitable for its use as a refractory material. The iron can be removed by suitable beneficiation methods. The main aim of this present investigation is to prepare a value added material from the mi...

متن کامل

Numerical Modelling of Backfill Grouting Approaches in EPB Tunneling

One of the main issues involved during tunnel construction with tunnel boring machines is the tail gap grouting. This gap is between the external diameter of tunnel lining and the excavation boundary that is filled with high-pressure grouting materials. In this work, three different approaches of gap grouting modeling in the FLAC3D software are investigated with a special attention to the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2000