The complexity of scheduling job families about a common due date
نویسنده
چکیده
Family scheduling problems are characterized by a setup time structure where setups are only required between jobs from different families. We consider the problem of scheduling job families on parallel machines to minimize weighted deviation about a common due date. Various special cases of this problem have been considered in the literature. This note summarizes known complexity results and introduces new complexity results. We show that the total earliness/tardiness problem is unary NP-hard when the number of machines and families are arbitrary, thus generalizing an earlier result and answering a longstanding open question in the literature.
منابع مشابه
An approximation algorithm and FPTAS for Tardy/Lost minimization with common due dates on a single machine
This paper addresses the Tardy/Lost penalty minimization with common due dates on a single machine. According to this performance measure, if the tardiness of a job exceeds a predefined value, the job will be lost and penalized by a fixed value. Initially, we present a 2-approximation algorithm and examine its worst case ratio bound. Then, a pseudo-polynomial dynamic programming algorithm is de...
متن کاملMaximizing service level in a β-robust job shop scheduling model
In the realm of scheduling problems, different sources of uncertainty such as probabilistic durations of jobs or stochastic breakdowns of machines can arise. Given this, one highly desirable characteristic of an intelligent schedule is to bring better punctuality with less efficiency-loss because a dominant factor in customer appreciation is punctuality. It is also one of the most intangible to...
متن کاملSINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT
In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...
متن کاملEarliness/tardiness scheduling with a common due date and family setups
We examine the problem of scheduling jobs, on a single processor to minimise the total earliness and tardiness costs about a common due date. Jobs belong to mutually exclusive families and a sequence independent setup task is required when processing switches from a job of one family to a job of another. We extend earlier results to obtain necessary optimal conditions for this problem. These ar...
متن کاملA Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Oper. Res. Lett.
دوره 20 شماره
صفحات -
تاریخ انتشار 1997