Simulating Schedule Optimization Problem in Steelmaking Continuous Casting Process
نویسندگان
چکیده
This paper establishes the models of the steelmaking continuous casting (SCC) process, and proposed the improved algorithms for this problem. The simulation results of a computerized scheduling system are also given to prove the model. The SCC process scheduling problem is very difficult to get a good performance solution in practice. The scheduling of the SCC process requires that each cast plan is processed on time, and the charges should be processed continuously for the same caster in the same cast, as well as the waiting time of the charges cannot be conflicted mutually in the same converters. We propose a quantum-behaved particle swarm optimization (QPSO) and improved algorithm strategy. The results show that the QPSO is very efficient for solving the SCC production scheduling problem, especially for large scale problem. (Received, processed and accepted by the Chinese Representative Office.)
منابع مشابه
Mathematical Simulation for the Effects of Flow Control Devices in a Six- strand Tundish in Continuous Casting of Steel Billet
The method of continuous casting of steel is now often used in the metallurgical industry, due to the increasing demand for the production of high – quality steel. An important device of continuous casting machine is the tundish, in which a stabilized steel flow has a crucial effect on the quality and efficiency conditions of the continuous casting process. In this study fluid flows in a six – ...
متن کاملDynamic Optimal Scheduling Method and Its Application for Converter Fault in Steelmaking and Continuous Casting Production Process
In steelmaking and continuous casting (SMCC) production process, converter fault can lead to unexpected changes to the pre-specified converter-continuous caster production mode so that the original scheduling plan becomes unrealizable. In this paper, the dynamic scheduling problem in response to converter fault is firstly analyzed. This is then followed by the establishment of a novel multi-obj...
متن کاملA mixed-integer linear programming model for the continuous casting planning
The development of optimization models for planning and scheduling is one of the most useful tools for improving productivity of a large number of manufacturing companies. This paper presents a mixed-integer programming model for scheduling steelmaking-continuous casting production. We first review the recent works in continuous casting planning. We focus on a model inspired from an application...
متن کاملComparison of different classification methods on castabilty data coming from steelmaking practice
The problem of the prediction of a critical situation during continuous casting in common steelmaking practice is faced through different traditional soft–computing techniques: the task is to divide the data in two classes corresponding to good and bad casting behaviour respectively. Moreover, a novel algorithm, the Model–based method, is presented. The performance obtained by the different tec...
متن کاملPlanning and scheduling of steel plates production. Part II: Scheduling of continuous casting
Production planning and scheduling in the steel industry are challenging problems due to large number of products being produced. This work deals with scheduling of the continuous casting of steelmaking, i.e. determination of charge sequence in each casting machine. Since a full-space model Mixed-Integer Linear Programming (MILP) approach is computationally intractable for long term continuous ...
متن کامل