Parallel Job Scheduling - A Status Report
نویسندگان
چکیده
There are many different ways to schedule parallel jobs, and the threads which make them up [17]. But only a few mechanisms are used in practice and studied in detail. Two approaches that have dominated the last decade are backfilling and gang scheduling. In this section we review their variants and the connections between them. We then review the special requirements of scheduling parallel jobs on a grid, and algorithms that have been developed to address them. 2.1 Backfilling
منابع مشابه
Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage
In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...
متن کاملDesign of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...
متن کاملParallel Jobs Scheduling with a Specific Due Date: Asemi-definite Relaxation-based Algorithm
This paper considers a different version of the parallel machines scheduling problem in which the parallel jobs simultaneously requirea pre-specifiedjob-dependent number of machines when being processed.This relaxation departs from one of the classic scheduling assumptions. While the analytical conditions can be easily statedfor some simple models, a graph model approach is required when confli...
متن کاملTwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...
متن کاملIs a Unit - Time Job Shop Not Easierthan
This paper gives the positive answer to the question posed in the title for a wide class of minimization criteria including the maximum completion time, maximum lateness , total completion time, total weighted completion time, total tardiness, total weighted tardiness, number of late jobs and the weighted number of late jobs. That is any scheduling problem for m identical parallel machines to m...
متن کامل