Uncertainty and Capacity Constraints: Reconsidering the Aggregate Production Function
نویسنده
چکیده
The Cobb–Douglas function is today one of the most widely adopted assumptions in economic modeling, yet both its theoretical and empirical bases have long been under question. This paper builds an alternative function on very different (albeit also neoclassical) microfoundations aimed at both addressing those theoretical drawbacks and providing a better empirical fit than the Cobb–Douglas formula. The new model, unlike the Cobb–Douglas function, does not portray installed capacity as aggregate capital but as a sunk cost generating economic rents. An analysis of 1949–2008 annual U.S. growth data suggest this alternative model explains nearly 85 percent of GDP fluctuations and is empirically more robust than the Cobb–Douglas, whilst both contemporary and lagged aggregate capital are statistically rejected as explanatory variables. This lends support to the old “Cambridge Critique”, according to which using value-weighted capital aggregates to explain production simply makes no sense. At face value, these results not only pose a question on any macroeconomic model assuming a Cobb–Douglas function but also point towards an alternative interpretation of phenomena such as the way monetary policy impacts productivity. JEL E22, E23
منابع مشابه
Predicting the Unpredictable: Forecastable Bubbles and Business Cycles under Rational Expectations
A popular interpretation of the Rational Expectations/Efficient Markets hypothesis states that, if it holds, market valuations must follow a random walk; hence, the hypothesis is frequently criticized on the basis of empirical evidence against such a prediction. Yet this reasoning incurs what we could call the ‘fallacy of probability diffusion symmetry’: although market efficiency does indeed i...
متن کاملCommodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method
Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملUncertainty in linear fractional transportation problem
In this paper, we study the linear fractional transportation problem with uncertain arameters. After recalling some definitions, concepts and theorems in uncertainty theory we present three approaches for solving this problem. First we consider the expected value of the objective function together with the expectation of satisfying constraints. Optimizing the expected value of the objective fun...
متن کامل