Robust Preemptive Resource Assignment for Multiple Software Projects Using Parameter Design

نویسنده

  • Lai-Hsi Lee
چکیده

Project preemption allows resources flow passively from one project or task to another. Due to high-cost and high-risk characteristics of software development, project preemption might have a significant impact on the ultimate completion time of a software project. This article examines the feasibility of the Taguchi’s parameter design to achieve robust resource assignment for multiple software projects with different preemptive rules. Two examples of software projects is employed to demonstrate the design process of the parameter design applying in the project scheduling problems. The first project illustrates a preemptive single software project. Project preemption occurs when resource vacations are considered. The second example considers problems of preemptive multiple project scheduling. The parameter design with preemption rules and scheduling heuristics are employed to solve the problem. The results show that the parameter design can achieve robust resource assignment by minimizing the effect of task variation.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Preemptive multimode resource constrained project scheduling model with cash flows

Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...

متن کامل

A two Stage Heuristic Solution Approach for Resource Assignment during a Cell Formation Problem

Design of Cellular Manufacturing System involves four major decisions: Cell formation (CF), Group layout (GL), Group scheduling (Gs) and Resource assignment (RA).  These problems should be regarded, concurrently, in order to obtain an optimal solution in a CM environment. In this paper a two stage heuristic procedure is proposed for CF and RA decisions problem. The solution approach contains a ...

متن کامل

An Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems

In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...

متن کامل

Robust Fixed-order Gain-scheduling Autopilot Design using State-space Stability-Preserving Interpolation

In this paper, a robust autopilot is proposed using stable interpolation based on Youla parameterization. The most important condition of stable interpolation between local controllers is the preservation of stability so that each local controller can ensure stability for an open neighborhood around a nominal point. The proposed design used fixed-order robust controller with parameter-dependent...

متن کامل

Scheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow

This paper proposed a parallel automated assembly line system to produce multiple products having multiple autonomous guided vehicles (AGVs). Several assembly lines are configured to produce multiple products in which the technologies of machines are shared among the assembly lines when required. The transportation between the stations in an assembly line (intra assembly line) and among station...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008