Readiness of the ATLAS Trigger and Data Acquisition system for the first LHC beams

نویسنده

  • W. Vandelli
چکیده

The ATLAS Trigger and Data Acquisition (TDAQ) system is based on O(2k) processing nodes, interconnected by a multi-layer Gigabit network, and consists of a combination of custom electronics and commercial products. In its final configuration, O(20k) applications will provide the needed capabilities in terms of event selection, data flow, local storage and data monitoring. In preparation for the first LHC beams, many TDAQ sub-systems already reached the final configuration and roughly one third of the final processing power has been deployed. Therefore, the current system allows for a sensible evaluation of the performance and scaling properties. In this paper we introduce the ATLAS TDAQ system requirements and architecture and we discuss the status of software and hardware component. We moreover present the results of performance measurements validating the system design and providing a figure for the ATLAS data acquisition capabilities in the initial data taking period.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

ATLAS Trigger and Data Acquisition: Capabilities and Commissioning

The ATLAS trigger system is based on three levels of event selection that selects the physics of interest from an initial bunch crossing rate of 40 MHz to an output rate of ∼200 Hz compatible with the offline computing power and storage capacity. During nominal LHC operations at a luminosity of 1034 cm−2s−1, decisions must be taken every 25 ns. The LHC is expected to begin operations with a pea...

متن کامل

The Trigger of the Atlas Experiment

With the high bunch-crossing and interaction rates and potentially large event sizes the experiments at the LHC challenge data acquisition and trigger systems. Within the ATLAS experiment, a multi-level trigger system based on hardware and software is employed to cope with the task of event-rate reduction. This review article gives an overview of the trigger of the ATLAS experiment highlighting...

متن کامل

The ATLAS Trigger Core Configuration and Execution System in Light of the ATLAS Upgrade for LHC Run 2

During the 2013/14 shutdown of the Large Hadron Collider (LHC) the ATLAS first level trigger (L1) and the data acquisition system (DAQ) were substantially upgraded to cope with the increase in luminosity and collision multiplicity, expected to be delivered by the LHC in 2015. Upgrades were performed at both the L1 stage and the single combined subsequent high level trigger (HLT) stage that has ...

متن کامل

The software of the ATLAS beam pick-up based LHC monitoring system

The ATLAS BPTX stations are comprised of electrostatic button pick-up detectors, located 175 m away along the beam pipe on both sides of ATLAS. The pick-ups are installed as a part of the LHC beam instrumentation and used by ATLAS for timing purposes. The signals from the ATLAS BPTX detectors are used both in the trigger system and for a stand-alone monitoring system for the LHC beams and timin...

متن کامل

The ATLAS Level-1 Trigger: Status of the System and First Results from Cosmic-Ray Data

The ATLAS detector at CERN’s Large Hadron Collider (LHC) will be exposed to proton-proton collisions from beams crossing at 40 MHz. At the design luminosity of 10 cm s there are on average 23 collisions per bunch crossing. A threelevel trigger system will select potentially interesting events in order to reduce the read-out rate to about 200 Hz. The first trigger level is implemented in customb...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008