Commissioning and First Performance of the Lhc Beam Instrumentation

نویسنده

  • R. Jones
چکیده

This paper will outline the progress with LHC commissioning to date, detailing the performance achieved with all the main LHC beam instrumentation systems. It will include an overview of the beam loss system and its role in machine protection, along with that of the beam position system and its use for automatic orbit control. Results will be shown from the highly sensitive base band tune system as well as the bunch-bybunch and DC beam current transformer systems, the synchrotron light monitoring systems, the wire scanner system and OTR screens. INTRODUCTION The first beams circulated in the LHC on 10 September 2008 in full view of the world’s media. This was a resounding success, and was followed a few days later with RF captured beams circulating for several hours. Nine days on, a poor superconducting splice overheated during a hardware test at high current, creating an arc that pierced the helium containment vessel, with severe consequences. 14 months later, after a major magnet repair and consolidation programme, the LHC was once again cold and ready to take beam. Despite these efforts and the installation of a completely new Quench Protection System (QPS) its energy is currently limited to 3.5 TeV per beam. Further consolidation, requiring a long shutdown in 2012, will be necessary before it can run at its design energy of 7 TeV per beam. A one month run at the end of 2009 saw the LHC quickly advance with optics, collimation and working point studies at its 450 GeV injection energy. Ramp commissioning to 1.18 TeV followed, ending in collisions at 1.18 TeV per beam in all of its four main experiments. Further consolidation work was carried out on both the machine and experiments for the first two months of 2010, before the start of a 2 year run at the end of February. To date (late April 2010) the LHC is routinely ramping 2×10 protons to 3.5 TeV and colliding with a β* of 2 m in all four experiments. The emphasis now is on increasing the total intensity in the machine. This rapid progress with beam commissioning is in a large part down to the very good beam instrumentation with which the LHC is equipped. These systems and their contributions to this commissioning effort will be the subject of the remainder of this paper.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Lhc Beam Stability and Performance of the Q/q’ Diagnostic Instrumentation

The BBQ tune (Q) and chromaticity (Q’) diagnostic systems played a crucial role during the LHC commissioning while establishing circulating beam and first ramps. Early on, they allowed to identify issues such as residual tune stability, beam spectrum interferences and beam-beam effects – all of which may impact beam life-times and thus are being addressed in view of nominal LHC operation. This ...

متن کامل

Initial Results from Beam Commissioning of the Lhc Beam Dump System

Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The per...

متن کامل

The LHC as a Nucleus-Nucleus Collider

This paper begins with a summary of the status of the Large Hadron Collider at CERN, including the lead-ion injector chain and the plans for the first phases of commissioning and operation with colliding proton beams. In a later phase, the LHC will collide lead nuclei at centre-of-mass energies of 5.5 TeV per colliding nucleon pair. This leap to 28 times beyond what is presently accessible will...

متن کامل

Beam Instrumentation and Diagnostics for the LHC Upgrade

The extensive array of beam instrumentation with which the LHC is equipped, has played a major role in its commissioning, rapid intensity ramp-up and safe and reliable operation. High Luminosity LHC (HL-LHC) brings with it a number of new challenges in terms of beam instrumentation that will be discussed in this chapter. The beam loss system will need significant upgrades in order to be able to...

متن کامل

Lhc Beam Instrumentation

Six years before the scheduled commissioning of the LHC at CERN, the basic list of beam instruments has been established. This early date is needed due to the impact of the mechanical design of some detectors (mainly the beam position detectors) on the cryogenic part of the machine as well as for other projects due to the long R&D period (emittance measurements, tune and chromaticity diagnostic...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010