Optimal risk-sharing with effort and project choice
نویسندگان
چکیده
December 23, 2005 Abstract We consider first-best risk-sharing problems in which “the agent” can control both the drift (effort choice) and the volatility of the underlying process (project selection). In a model of delegated portfolio management, it is optimal to compensate the manager with an option-type payoff, where the functional form of the option is obtained as a solution to an ordinary differential equation. In the general case, the optimal contract is a fixed point of a functional that connects the agent’s and the principal’s maximization problems. We apply martingale/duality methods familiar from optimal consumptioninvestment problems.
منابع مشابه
Risk, Managerial Effort, and Project Choice*
In our model risk-neutral shareholders need to motivate a manager to select among projects with different risks, and to work hard in implementing the chosen project. Curvature of the manager’s compensation contract as a function of profit affects his attitude toward project risk. The optimal curvature depends on the trade-off between controlling project risk and motivating effort. The analysis ...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملAn Option-Revenue Sharing Coordination Contract with Price and Sales Effort Dependent Demand
This study proposes a novel option-revenue sharing coordination contract framework. In the proposed model, the retailer determines the number of order sales effort. The manufacturer sets the price of products for the wholesale strategy. The investigated supply chain problem analyzes the results of different strategies. In the proposed coordination contract problem, two types of games including ...
متن کاملAn optimal model for Project Risk Response Portfolio Selection (P2RPS) (Case study: Research institute of petroleum industry)
In the real world, risk and uncertainty are two natural properties in the implementation of Mega projects. Most projects fail to achieve the pre-determined objectives due to uncertainty. A linear integer programming optimization model was used in this work to solve a problem in order to choose the most appropriate risk responses for the project risks. A mathematical model, in which work structu...
متن کاملRisk Management Plan in Large Urban Projects
One of the risks distinguishes urban projects from other projects is to purchase of property obstacles. The matter is of more significance in large projects. Issues with regard to possessing property obstacles, lack of accurate layout drawings for underground facilities and following probable changes in designs make it vital to have specific studies on risk management of such projects. So thi...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- J. Economic Theory
دوره 133 شماره
صفحات -
تاریخ انتشار 2007