On Time with Minimal Expected Cost!
نویسندگان
چکیده
منابع مشابه
Maintenance Cost Analysis for Replacement Model with Perfect Minimal Repair
With the evolution of technology, the maintenance of sophisticated systems is of concern for system engineers and system designers. The maintenance cost of the system depends in general on the replacement and repair policies. The system replacement may be in a strictly periodic fashion or on a random basis depending upon the maintenance policy. At failure, the repair of the system may be perfor...
متن کاملA multi-stage stochastic programming for condition-based maintenance with proportional hazards model
Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...
متن کاملThe optimal age-based replacement policy for systems subject to shocks
In this article, two different systems subject to shocks occurring based on a non-homogeneous Poisson process (NHPP) are analyzed. Type –I system is consisted of a single unit and type –II system is consisted of two parallel units in which both units operate identically and simultaneously. In type –I system occurrence of a shock causes system stopping and consequently will be received minimal r...
متن کاملA New Multi-objective Model for Multi-mode Project Planning with Risk
The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...
متن کاملOn The Fractional Minimal Cost Flow Problem of a Belief Degree Based Uncertain Network
A fractional minimal cost flow problem under linear type belief degree based uncertainty is studied for the first time. This type of uncertainty is useful when no historical information of an uncertain event is available. The problem is crisped using an uncertain chance-constrained programming approach and its non-linear objective function is linearized by a variable changing approach. An illus...
متن کاملStudying the Expected Returns Based on Carhart Model Com-pared to CAPM Model and Implicit Capital Cost Model Based on Cash and Capital Flow of Growth and Value stocks
The purpose of this study was to examine the expected returns of Carhart model compared to the capital asset pricing model and the implicit capital cost model based on cash and capital returns of growth and value stocks. The statistical population consisted of the companies listed in Tehran Stock Exchange and the time domain is between 2007 and 2016. By choosing Cochran sampling, 126 companies ...
متن کامل