Scheduling Lacquer Production by Reachability Analysis - a Case Study 1

نویسندگان

  • Gerd Behrmann
  • Ed Brinksma
  • Martijn Hendriks
  • Angelika Mader
چکیده

In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage of this approach is that the expressiveness of timed automata allows to model scheduling problems of different kinds, unlike many classical approaches, and the problem class is robust against changes in the parameter setting. To fight the typical state space explosion problem a number of standard heuristics have to be used. We discuss the difficulties when modelling an industrial case of this kind, describe the experiments we performed, the heuristics used, and the techniques applied to allow to optimize costs (storage costs, delay costs, etc.) while searching for schedules.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling Lacquer Production by Reachability Analysis - a Case Study

In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...

متن کامل

Scheduling Lacquer Production by Reachability Analysis - a Case

In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...

متن کامل

Production by Reachability Analysis - a Case Study

In this paper we describe a case study on lacquer production scheduling that was performed in the European IST-project AMETIST and was provided by one of the industrial partners. The approach is to derive schedules by means of reachability analysis: with this technique the search mechanism of model checkers, in our case here Uppaal, is used to find feasible or optimal schedules. The advantage o...

متن کامل

Timed Automata Approach for the Axxom Case Study Scheduling a Lacquer Production

This report presents our first experiments with the AXXOM case study proposed in AMETIST. The production plan has been entirely modeled as a network of timed automata and the scheduling problem has been therefore reduced to a minimal cost path extraction problem. The minimal cost path problem has been solved successfully for the 29 lacquers defined in the case study. Several heuristics have bee...

متن کامل

A Case Study on Earliness/Tardiness Scheduling by Constraint Programming

The aim of this paper is to solve a problem on scheduling with earliness and tardiness costs using constraint programming approach, and to compare the results with the ones from the original timed automata approach. The case study, a production of lacquers, includes some real life features like operating hours or changeover times. Considering the earliness and tardiness costs of the case study,...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017