This paper presents industry test cases that illustrate the multi-disciplinary, constructive, iterative, and unique character of AEC projects. These test cases show that, to perform their tasks on these projects, AEC engineers construct task-specific engineering views from information in other engineering views. These engineers have difficulty constructing and integrating task-specific views on these projects today. Based on these observations, this paper proposes that engineers could benefit from an approach that provides them with simple, formal methods to iteratively construct a task-specific view from other views as needed, and control the integration of these views as the project progresses. In this way, an integrated project model emerges as a directed acyclic graph of task-specific views and dependencies. This paper defines requirements for such an approach, and discusses current project modeling approaches in terms of these requirements. While points of departure, existing approaches do not explicitly enable engineers to easily construct and integrate task-specific views and control a project model in a way that maps closely to the way AEC projects work today. To address these requirements, this paper introduces the conceptually simple Perspective Approach that enables engineers from multiple disciplines to formalize the dependency of a view on other views, and to control an evolving project model of these views and their dependencies.
منابع مشابه
Engineering Test Cases to Motivate the Formalization of an Aec Project Model as a Directed Acyclic Graph of Views and Dependencies
To perform specific tasks, Architecture, Engineering, and Construction (AEC) professionals construct task-specific engineering views from information in other engineering views. Each view contains project information that is structured for an engineer’s specific task; engineers are responsible for the information in their respective views. This paper presents industry test cases illustrating th...
متن کاملCIFECENTER FOR INTEGRATED FACILITY ENGINEERING Perspectors: Composable, Reusable Reasoning Modules to Automatically Construct a Geometric Engineering View from Other Geometric Engineering Views
As they design, plan, and execute AEC projects, engineers today construct task-specific geometric views based on information contained in other engineers’ geometric views. Traditionally, engineers have constructed these views manually, using pencils and more recently CAD. Manually constructing views is often difficult, time-consuming, and error-prone. Newer approaches develop central project mo...
متن کاملCIFECENTER FOR INTEGRATED FACILITY ENGINEERING The Perspective Approach: Enabling Engineers to Construct and Integrate Geometric Views to Generate an Evolving Project Model
Enabling engineers to construct integrated and task-specific views of an evolving AEC project is an important and unresolved issue in both practice and research. Many current project-modeling approaches construct and integrate a predefined central model from which task-specific views are constructed. Others construct and integrate a “federation” of predefined task-specific views. AEC processes ...
متن کاملAn Integrated Risk-Based Technique for Project Plan Selection
Selecting an effective project plan is a significant area in the project management. The present paper introduces a technique to identify the project plan efficient frontier for assessing the alternative project plans and selecting the best plan. The efficient frontier includes two criteria: the project cost and the project time. Besides, the paper presents a scheme to incorporate Directed Ac...
متن کاملPerspectors: composable, reusable reasoning modules to construct an engineering view from other engineering views
As engineers design, plan, and execute architecture, engineering, and construction (AEC) projects, they construct task-specific views. These views contain information that is structured for their specific tasks. Engineers generally construct these views based on information contained in other engineers’ views. Traditionally, engineers have manually constructed these views using pencils and more...