A Bi-Objective Scheduling Algorithm for Desktop Grids with Uncertain Resource Availabilities

نویسندگان

  • Louis-Claude Canon
  • Adel Essafi
  • Grégory Mounié
  • Denis Trystram
چکیده

In this work, we consider the execution of applications on desktop grids. Such parallel systems use idle computing resources of desktops distributed over the Internet for running massively parallel computations. The applications are composed of workflows of independent non-preemptive sequential jobs that are submitted by successive batches. Then, the corresponding jobs are executed on the distributed available resources according to some scheduling policy. However, most resources are not continuously available over time since the users give their idle CPU time only for some time when they are not using their desktops. Moreover, even if the dates of unavailability periods are estimated in advance, they are subject to uncertainties. This may drastically impact the global performances by delaying the completion time of the applications. The aim of this paper is to study how to schedule efficiently a set of jobs in the presence of unavailability periods on identical machines. In the same time, we are interested in reducing the impact of disturbances on the unavailability periods. This is achieved by maximizing the stability that measures the distance between the makespan of the disturbed instance over the initial one. Our main contribution is the design of a new parametrized algorithm and the analysis of its performance through structural properties. This algorithm reduces the impact of disturbances on availability periods without worsening too much the makespan. Its interest is assessed by running simulations based on realistic workflows. Moreover, theoretical results are obtained under the assumption that the size of every availability interval is at least twice the size of the largest job.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Uncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem

Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...

متن کامل

Multi-objective and Scalable Heuristic Algorithm for Workflow Task Scheduling in Utility Grids

 To use services transparently in a distributed environment, the Utility Grids develop a cyber-infrastructure. The parameters of the Quality of Service such as the allocation-cost and makespan have to be dealt with in order to schedule workflow application tasks in the Utility Grids. Optimization of both target parameters above is a challenge in a distributed environment and may conflict one an...

متن کامل

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...

متن کامل

A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities

In this paper, a novel mathematical model for a preemption multi-mode multi-objective resource-constrained project scheduling problem with distinct due dates and positive and negative cash flows is presented. Although optimization of bi-objective problems with due dates is an essential feature of real projects, little effort has been made in studying the P-MMRCPSP while due dates are included i...

متن کامل

A chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability

A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011