Jackson's pseudo-preemptive schedule and cumulative scheduling problems
نویسندگان
چکیده
The aim of this paper is to show the usefulness of the Jackson’s pseudo-preemptive schedule (JPPS) for solving cumulative scheduling problems. JPPS was introduced for the m-processor scheduling problem Pm=ri; qi=Cmax. In the latter problem, a set I of n operations has to be scheduled without preemption on m identical processors in order to minimize the makespan. Each operation i has a release date (or head) ri, a processing time pi , and a tail qi. In the cumulative scheduling problem (CuSP), an operation i requires a constant amount ei of processors throughout its processing. A CuSP is obtained, for instance, from the resource constrained project scheduling problem (RCPSP) by choosing a resource and relaxing the constraints induced by the other resources. We state new properties on JPPS and we show that it can be used for studying the CuSP and for performing adjustments of heads and tails using a strategy very close to the one designed by Carlier and Pinson for the 1=ri, qi=Cmax sequencing problem. It con8rms the interest of JPPS for solving RCPSP. c © 2004 Elsevier B.V. All rights reserved.
منابع مشابه
Modeling and Solution Procedure for a Preemptive Multi-Objective Multi-Mode Project Scheduling Model in Resource Investment Problems
In this paper, a preemptive multi-objective multi-mode project scheduling model for resource investment problem is proposed. The first objective function is to minimize the completion time of project (makespan);the second objective function is to minimize the cost of using renewable resources. Non-renewable resources are also considered as parameters in this model. The preemption of activities ...
متن کاملMulticoloring Planar Graphs and Partial k-Trees
We study graph multicoloring problems, motivated by the scheduling of dependent jobs on multiple machines. In multicoloring problems, vertices have lengths which determine the number of colors they must receive, and the desired coloring can be either contiguous (non-preemptive schedule) or arbitrary (preemptive schedule). We consider both the sum-of-completion times measure, or the sum of the l...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...
متن کاملProperties of optimal schedules in preemptive shop scheduling
In this work we show that certain classical preemptive shop scheduling problems with integral data satisfy the following integer preemption property: there exists an optimal preemptive schedule where all interruptions and all starting and completion times occur at integral dates. We also give new upper bounds on the minimal number of interruptions for various shop scheduling problems.
متن کاملSome Preemptive open Shop Scheduling Problems with a Renewable or a Nonrenewable Resource. (Discrete Applied Mathematics 35 (1992) 205-219)
De Werra, D. and J. Blazewicz, Some preemptive open shop scheduling problems with a renewable or a nonrenewable resource, Discrete Applied Mathematics 35 (1992) 205-219. An edge coloring model is presented for a preemptive open shop problem. Constraints generated by a single resource have to be taken into account. The case of a renewable and of a nonrenewable resource as considered. Since the e...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Discrete Applied Mathematics
دوره 145 شماره
صفحات -
تاریخ انتشار 2004