Integrating routing and scheduling for pipeless plants in different layouts
نویسندگان
چکیده
Pipeless batch plants are built to provide the ability to adapt to fast market changes. The scheduling of pipeless plants adds new challenges to the scheduling of conventional batch plants. This is because of the requirement to consider the allocation of resources and also the plant layout so that vessels can move from one processing station to another without conflict. This research investigates the integrated problem of scheduling and routing in pipeless plants and develops a constraint-based methodology suitable for different layouts. During the scheduling process, besides time and resource allocation, a planner is also called to find possible routes to move vessels from one processing station to the next proposed station. Each of the dynamically generated routes is immediately check for feasible track allocation so that any infeasible route is discarded as soon as possible to save computational time. A typical scheduling problem and results are described in detail to show how this integrated approach works.
منابع مشابه
A novel continuous-time MILP approach for short- term scheduling of multipurpose pipeless batch plants
This work presents an alternative MILP mathematical formulation for the shortterm scheduling of pipeless batch plants based on a continuous-time representation that relies on the general precedence notion. Besides of the intrinsic characteristics of a pipeless plant, this model considers the moveable vessels as an additional resource that has to be allocated and sequenced. This fact allows prop...
متن کاملSupply Chain Scheduling Using a Transportation System Composed of Vehicle Routing Problem and Cross-Docking Approaches
This study considers a combination of cross-docking and vehicle routing problem (VRP) approachesto transport raw material and parts in a supply chain. The supply chain is composed of some supplierswhich are spread in different geographical zones and multiple shared vehicles with different speedsand capacities for transporting orders from the suppliers to a manufacturer. After ...
متن کاملA JOINT DUTY CYCLE SCHEDULING AND ENERGY AWARE ROUTING APPROACH BASED ON EVOLUTIONARY GAME FOR WIRELESS SENSOR NETWORKS
Network throughput and energy conservation are two conflicting important performance metrics for wireless sensor networks. Since these two objectives are in conflict with each other, it is difficult to achieve them simultaneously. In this paper, a joint duty cycle scheduling and energy aware routing approach is proposed based on evolutionary game theory which is called DREG. Making a trade-off ...
متن کاملHybrid modelling and simulation of pipeless batch plants
In a pipeless batch plant, mobile reactors are transported between process stations. Typical process steps performed at these stations are filling, measuring, feeding and cooling/heating. In this paper, three hybrid models of a pipeless batch plant for the production of copolymers have been developed. The dynamics of the chemical reactions are modelled in detail by means of mass balances. The t...
متن کاملA multi-objective memetic algorithm for risk minimizing vehicle routing problem and scheduling problem
In this paper, a new approach to risk minimizing vehicle routing and scheduling problem is presented. Forwarding agents or companies have two main concerns for the collection of high-risk commodities like cash or valuable commodities between the central depot and the customers: one; because of the high value of the commodities transported, the risk of ambush and robbery are very high. Two; the ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Chemical Engineering
دوره 29 شماره
صفحات -
تاریخ انتشار 2005