Construction, Commissioning and Cryogenic Performances of the First Tesla Test Facility (ttf) Cryomodule

نویسندگان

  • C. Pagani
  • J. G. Weisend
  • R. Bandelmann
  • D. Barni
  • A. Bosotti
  • G. Grygiel
  • H. Kaiser
  • U. Knopf
  • R. Lange
  • F. Loeffler
  • P. Pierini
  • O. Peters
  • B. Petersen
  • D. Sellmann
  • S. Wolff
چکیده

A principal goal of the ongoing TESLA superconducting linac project is the production of affordable cryostats that still meet stringent requirements for alignment, vibration and heat leak. Each cryostat contains 8 superconducting RF cavities cooled to 1.8 K, a quadrupole magnet package cooled to 4.5 K, thermal shields cooled to 70 K and 4.5 K, active and passive magnetic shielding, cryogenic service pipes and all associated instrumentation. The axes of the 8 cavities must be aligned to the ideal beam axis to within ± 0.5 mm and those of the quadrupoles to within ± 0.1 mm. Additionally, the vertical mid plane of the quadrupole package must be aligned to the vertical direction to ± 0.1 mrad. These alignments must remain fixed after cool down and during operation. The cryostat must be designed so that there are no resonant vibration modes near the 10 Hz operating frequency of the accelerator. Although dynamic loads associated with the operation of the RF and the beam dominate the heat load, reasonable efforts to reduce the static heat leak into the cryostat are necessary. The first of these cryostats has been tested in early June, 1997. This paper reports on the assembly of the cryostat and its performance during cryogenic and beam testing. Alignment, heat leak and vibration data are among the results discussed. The impact of the cryostat on the performance of the superconducting cavities is reviewed. Planned improvements in the cryostat design are also covered.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

TESLA Test Facility Control System and its Current Status

The TESLA Test Facility (TTF) linear accelerator for electrons is under construction at DESY [1]. It is based on the use of accelerating modules consisting of eight nine-cell superconducting cavities. About one year this linac (more than 100 meters in length) operated with one cryomodule and produced 125 MeV electrons. This period was intensively used by the control system developers to test, c...

متن کامل

Mechanical Stabi E Iv Cryomodule Lity Study of Typ ( Ilc Prototype )

bstract An ANSYS modal and harmonic finite element analysis (FEA) was performed in order to investigate cryomodule design mechanical stability for the proposed International Linear Collider (ILC). The current cryomodule, designated Type IV or (T4CM), closely follows the Type III TESLA Test Facility (TTF) version used at DESY, with the exception of a proposed location of the superconducting (SC)...

متن کامل

Bunch Compressor Ii at the Tesla Test Facility

In the TESLA Test Facility (TTF), short bunches with low emittance are needed for the operation of a free electron laser. Several stages of bunch compression by means of magnetic chicanes will be used to reach the required peak current. The second stage of the bunch compression system, bunch compressor II, has been taken into operation recently. We describe design and instrumentation of the bun...

متن کامل

The Tesla Cryogenic Accelerator Modules

The Tera-eV Energy Superconducting Linear Accelerator (TESLA), a 32 km long superconducting linear electron/positron collider of 500 GeV (upgradeable to 800 GeV) centre of mass energy, presently in the planning phase at DESY, will consist of about 21000 superconducting RF 9-cell cavities of pure Niobium. Each cavity of about 1 m length has to be cooled in a 2.0 K helium bath and operated at 1.3...

متن کامل

Tesla Test Facility Stripline Readout System

The elaboration of the signals provided by the fourstripline Beam Position Monitors (BPM) on the superconducting linac TTF will be accomplished by parallel rf circuits, giving a signal of ~1 V /cm, indipendent of beam current, for both horizontal and vertical beam positions with time response ~1μs. and useful range > ±1 cm The performances with respect to thermal drifts and input dynamics are p...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999