Automatic Generation of Progress Profiles for Earthwork Operations Using 4d Visualisation Model

نویسندگان

  • Raj Kapur Shah
  • Nashwan Dawood
  • Serafim Castro
چکیده

Despite of the advances in construction planning and scheduling software, construction managers and planners are still facing problems in achieving accurate planning, scheduling and costing due to the one-off nature of the construction projects and the inherently uncertain site conditions and soil characteristics. The aim of the research presented in this paper is to introduce a new methodology for integration of ‘variable productivity’ data with a visualisation model of earthwork operations. To achieve this aim, a number of objectives have been set: identification of current industrial practices and confirming the needs and aspirations of the industry, designing of a methodology and a model to integrated variable productivity with visualisation, and performing a case study to demonstrate and verify the model. The paper presents a prototype of a 4D visualisation model which is designed by integrating the road design data, quantities of cut and fill, productivity model, algorithms for modelling terrain surfaces and a progress profile visualiser. The model generates automatically terrain surfaces of progress profiles for earthwork operations and visualises progress profiles throughout the construction operations under different site and soil conditions. It is demonstrated with a real life case study in a road project. The paper concludes that the model should be able to assist in producing efficient construction scheduling and resource planning, thereby reducing production cost and improving on-site productivity.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Automatic Generation and Visualization of Location-based Scheduling

ABSTRACT: Accurate and visual information of working locations is vital for efficient resource planning and location-based scheduling of earthworks, which is missing in existing linear schedules. Thus, construction managers have to depend on subjective decisions for resources allocation and progress monitoring from location aspects. This has caused uncertainties in planning and scheduling, and ...

متن کامل

Automatic Generation of a Multi Agent System for Crisis Management by a Model Driven Approach

Considering the increasing occurrences of unexpected events and the need for pre-crisis planning in order to reduce risks and losses, modeling instant response environments is needed more than ever. Modeling may lead to more careful planning for crisis-response operations, such as team formation, task assignment, and doing the task by teams. A common challenge in this way is that the model shou...

متن کامل

An innovative approach for generation of a time location plan in road construction projects

Existing linear scheduling methods for earthwork activities lack accurate scheduling locations in road construction projects. Project planners and construction managers largely depend on subjective decisions for the allocation of resources at correct locations. This has caused uncertainties in planning and scheduling, and consequently delays and cost overruns of projects. Accurate information o...

متن کامل

Earthwork Volume Optimization Using Imperialistic Competitive Algorithm to Minimize Energy Consumption of Agricultural Land Leveling

Land leveling is one of the most important steps in soil preparation for consequent objectives.  Parallel policies need to take both energy and environmental subjects into the account as well as certain financial development and eco-friendly protection. Energy is one of the most important elements in agricultural sector. Nevertheless, pollution is linked with the usage of fossil fuels (particul...

متن کامل

Improving Accuracy in Earthwork Volume Estimation for Proposed Forest Roads Using a High-Resolution Digital Elevation Model

Nacrtak Earthwork usually represents the largest cost component in the construction of low-volume forest roads. Accurate estimates of earthwork volume are essential to forecast construction costs and improve the financial control of road construction operations. Traditionally, earthwork volumes are estimated using methods that consider ground data obtained from survey stations along road grade ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2008