Characteristics of a Fuzzy Project Network using Statistical Data
نویسندگان
چکیده
In the present paper, Characteristics of fuzzy project network using statistical data are discussed in detail in order to calculate the fuzzy critical path, fuzzy earliest times, fuzzy latest times and fuzzy total float. Fuzzy number as fuzzy activity time is constructed using interval estimate by calculating mean, variance and standard error. A new ranking function is used to discriminate the fuzzy numbers used as activity times in the fuzzy project network and used it in distance measure. The appropriateness and contribution of characteristics of fuzzy project network to ship building is discussed and calculated as an application to real life problem using statistical parameters.
منابع مشابه
Fuzzy Network Analysis for Projects with High Level of Risks – Uncertainty in Time and Structure
In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. In this paper we consider three types of i...
متن کاملInvestment Decision-Making about Portfolio of Technology Development Projects; Based on the Analysis of Success Criteria using Fuzzy Neural Network and MADM
Technology development project is a type of investment project and it is important to identify the performance indicators and planning for the correct investment. The purpose of this research is the development of indicators of portfolio success, accurate analysis of the effects of indicators on each other and the achievement of a proper investment model. In this research, the success criteria ...
متن کاملPerformance Appraisal of Research and Development Projects Value-Chain for Complex Products and Systems: The Fuzzy Three-Stage DEA Approach
The purpose of the current research is to provide a performance appraisal system capable of considering the value chain network structure of research and development (R&D) projects for Complex products and systems (CoPS) under uncertainty of data. Therefore, in order to achieve this goal, a network data envelopment analysis (NDEA) approach and the possibilistic programming to provide a new fuzz...
متن کاملAnalysis of critical paths in a project network with random fuzzy activity times
Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...
متن کاملIdentification and ranking risks of horizontal directional drilling for oil & gas wells by using fuzzy analytic network process, a case study for Gachsaran oil field wells
Risk ranking of Horizontal Directional Drilling (HDD) for gas and oil wells is a key criterion in the project feasibility, pricing and for introducing a risk management strategy that aims to reduce the number of failures in the installation phase and its negative consequences. HDD is currently widely used in drilling wells in Iran, but research in the area of identification and risks ranking of...
متن کامل